BS ISO 20890-5:2020
$142.49
Guidelines for in-service inspections for primary coolant circuit components of light water reactors – Eddy current testing of steam generator heating tubes
Published By | Publication Date | Number of Pages |
BSI | 2020 | 26 |
This document gives guidelines for pre-service inspection (PSI) and in-service inspections (ISI) by eddy current tests on non-ferromagnetic steam generator heating tubes of light water reactors, whereby the test is carried out using mechanised test equipment outwards from the tube inner side.
An in-service eddy current test of steam generator heating tube plugs as a component of the primary circuit is not an object of this document. Owing to the different embodiments of steam generator heating tube plugs, the use of specially adapted test systems to be qualified is necessary.
Test systems for the localisation of inhomogeneities (surface) and requirements for test personnel, test devices, the preparation of test and device systems, the implementation of the testing as well as the recording are defined.
Data concerning the test section, test extent, inspection period, inspection interval and evaluation of indications is defined in the nuclear safety standards.
It is recommended that the technical specifications are based on experience on U-tube bends with even bend radius (similar to the S/KWU design). To test other kind of tube bends (e.g. U-tube bends with two 90° bends) further qualifications will be provided.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
6 | Foreword |
7 | 1 Scope 2 Normative references |
8 | 3 Terms and definitions |
9 | 4 Inspection technique 4.1 Preliminary remark |
10 | 4.2 General 4.3 Standard technique 4.3.1 Multiple frequency technique with internal bobbin probe in differential arrangement |
11 | 4.3.2 Linking the signals of multiple frequencies with internal bobbin probe in differential arrangement (mixed technique) 4.3.3 Multifrequency system with internal bobbin probe in absolute arrangement 4.4 Inspection techniques for more extensive analyses |
12 | 5 Requirements 5.1 Test personnel 5.1.1 Task of NDT personnel 5.1.2 Personnel requirements |
13 | 5.2 Steam generator heating tubes |
14 | 5.3 Eddy current test equipment 5.3.1 General 5.3.2 Test robot |
15 | 5.3.3 Eddy current test system |
16 | 5.3.4 Assistant analysis system |
17 | 5.4 Data storage medium 6 Testing 6.1 General 6.2 Preparations 6.3 Implementation 6.3.1 General |
18 | 6.3.2 Data acquisition |
19 | 6.3.3 Data analysis |
21 | 6.4 Final measures 7 Recording 7.1 Test record and test report 7.2 Indication list 7.3 Findings record |
23 | Annex A (informative) General test procedure |
25 | Bibliography |