BSI 24/30487183 DC:2024 Edition
$24.66
BS EN IEC 63402-2-2 Energy efficiency systems – Smart grid – Customer energy management systems – Interface between the home/building CEM and resource manager(s) – Data model and messaging
Published By | Publication Date | Number of Pages |
BSI | 2024 | 141 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30487183-NC.pdf |
3 | 23K_95e_CD 1.pdf 23K_95e_CD.pdf |
4 | IEC+63402-2-2+ED1-CD-1-en.pdf |
13 | FOREWORD |
15 | Introduction |
16 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviations 3.1 Terms and definitions |
19 | 3.2 Abbreviations |
20 | 4 Energy management 4.1 Architectural overview |
21 | 4.2 Definition |
22 | 4.3 Energy Management roles 4.3.1 General 4.3.2 Energy producer role |
23 | 4.3.3 Energy consumer role |
24 | 4.3.4 Energy storage role 5 Resource Manager |
26 | 6 Customer Energy Manager () 6.1 General 6.2 Local optimization |
27 | 6.3 Implicit control |
28 | 6.4 Explicit control 6.5 Summary |
29 | 7 Energy Management Concepts 7.1 General 7.2 Design philosophy 7.3 Abnormal condition |
30 | 7.4 Power measurements 7.5 Power forecasts 7.6 Control types 7.6.1 General |
31 | 7.6.2 Power Envelope Based Control |
37 | 7.6.3 Power Profile Based Control |
39 | 7.6.4 Operation Mode Based Control |
42 | 7.6.5 Fill Rate Based Control |
45 | 7.6.6 Demand Driven Based Control |
47 | 8 Energy Management Data Models 8.1 Basic Data Types 8.1.1 General |
48 | 8.1.2 Common concepts related to Time 8.1.3 Common concepts related to Identifiers 8.1.4 Common concepts related to Strings |
49 | 8.1.5 Meaning of optionality 8.2 Resource Manager 8.2.1 ResourceManagerDetails |
50 | 8.2.2 PowerValue |
51 | 8.2.3 PowerForecastValue 8.2.4 PowerRange |
52 | 8.2.5 NumberRange 8.2.6 PowerMeasurement 8.2.7 Role |
53 | 8.2.8 ReceptionStatus 8.2.9 Transition |
54 | 8.2.10 Timer 8.2.11 InstructionStatusUpdate |
56 | 8.3 Power Forecast 8.3.1 Description 8.3.2 PowerForecast |
57 | 8.3.3 PowerForecastElement |
58 | 8.4 Control Types 8.4.1 Power Envelope Based Control |
62 | 8.4.2 Power Profile Based Control |
67 | 8.4.3 Operation Mode Based Control |
69 | 8.4.4 Fill Rate Based Control |
77 | 8.4.5 Demand Driven Based Control |
83 | 8.5 Enumerations 8.5.1 RoleType 8.5.2 Commodity |
84 | 8.5.3 CommodityQuantity 8.5.4 Currency |
85 | 8.5.5 InstructionStatus |
86 | 8.5.6 ControlType |
87 | 8.5.7 PowerForecastType 8.5.8 .PowerEnvelopeLimitType |
88 | 8.5.9 .PowerEnvelopeConsequenceType 8.5.10 ReceptionStatusValues 8.5.11 .PowerSequenceStatus |
89 | 9 Communication 9.1 Introduction |
90 | 9.2 Generic Tasks 9.2.1 Update Resource Manager Details 9.2.2 Activate Control Type |
91 | 9.2.3 Update Active Control Type |
92 | 9.2.4 Communicate Power Measurement 9.2.5 Update Power Forecast |
93 | 9.2.6 Revoke Power Forecast |
94 | 9.3 Power Envelope Based Control Tasks 9.3.1 Update Power Constraints |
95 | 9.3.2 Revoke Power Constraints |
96 | 9.3.3 Update Power Plan |
97 | 9.3.4 Update Energy Constraints |
98 | 9.3.5 Revoke Energy Constraints |
99 | 9.3.6 Process Instruction 9.3.7 Revoke Instruction |
100 | 9.4 Power Profile Based Control Tasks 9.4.1 Update Power Profile Definition |
101 | 9.4.2 Revoke Power Profile Definition |
102 | 9.4.3 Update Power Profile status 9.4.4 Process Schedule Instruction |
103 | 9.4.5 Revoke Schedule Instruction |
104 | 9.4.6 Process Start Interruption Instruction |
105 | 9.4.7 Revoke Start Interruption Instruction |
106 | 9.4.8 Process End Interruption Instruction |
107 | 9.4.9 Revoke End Interruption Instruction |
108 | 9.5 Operation Mode Based Control Tasks 9.5.1 Update System Description |
109 | 9.5.2 Revoke System Description |
110 | 9.5.3 Update status 9.5.4 Update Timer status |
111 | 9.5.5 Process Instruction |
112 | 9.5.6 Revoke Instruction 9.6 Fill Rate Based Control Tasks 9.6.1 Update System Description |
114 | 9.6.2 Revoke System Description 9.6.3 Update Actuator status |
115 | 9.6.4 Update Storage status 9.6.5 Update Timer status |
116 | 9.6.6 Update Leakage Behaviour |
117 | 9.6.7 Revoke Leakage Behaviour 9.6.8 Update Usage Forecast |
118 | 9.6.9 Revoke Usage Forecast |
119 | 9.6.10 Update Fill Level Target Profile |
120 | 9.6.11 Revoke Fill Level Target Profile 9.6.12 Process Instruction |
121 | 9.6.13 Revoke Instruction |
122 | 9.7 Demand Driven Based Control Tasks 9.7.1 Update System Description |
123 | 9.7.2 Revoke System Description |
124 | 9.7.3 Update Actuator status |
125 | 9.7.4 Update Timer status 9.7.5 Update Average Demand Rate Forecast |
126 | 9.7.6 Revoke Average Demand Rate Forecast |
127 | 9.7.7 Process Instruction |
128 | 9.7.8 Revoke Instruction |
129 | Annex A Use Cases informative A.1 Overview |
130 | A.2 Organizing A.2.1 UC_EM_O100: Configuring Customer Energy Manager (CEM) in network |
131 | A.2.2 UC_EM_O101: Configuring master with Smart Grid Operator Credentials A.3 Scheduling A.3.1 UC_EM_S200: collects Energy Profiles, Tariff Profiles and Storage Details |
132 | A.4 Management A.4.1 UC_EM_M300: selects alternative Energy Sequences by energy costs A.4.2 UC_EM_M301 modifies start time of Energy Sequence |
133 | A.4.3 UC_EM_M302: changes an Energy Profile to make temporary use of stored energy A.4.4 UC_EM_M303: Demanded power cannot be delivered by domestic grid |
134 | A.4.5 UC_EM_M304: Two electric vehicles conflicting in their power load |
135 | A.4.6 UC_EM_M305: requests temporarily energy saving |
136 | A.4.7 UC_EM_M306: Energy Storage requests high priority |
137 | A.5 Case Studies A.5.1 UC_EM_M307 Charging an in the context of JWG4 (“Power Limitation ”) with the dynamic control mode of ISO 1511820 |
139 | A.5.2 UC_EM_M308: Charging an in the context of JWG4 (“Power Limitation ”) with the scheduled control mode of ISO 15118 series and monetary incentives |
141 | Bibliography |