BSI PD CEN ISO/TS 3250:2022
$215.11
Petroleum, petrochemical and natural gas industries. Calculation and reporting production efficiency in the operating phase
Published By | Publication Date | Number of Pages |
BSI | 2022 | 82 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | European foreword Endorsement notice |
7 | Foreword |
8 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions |
20 | 3.2 Abbreviations |
21 | 4 Application 4.1 Users of this document |
22 | 4.2 Framework conditions 4.2.1 General |
24 | 4.2.2 Quality assurance 4.2.3 HSE considerations |
25 | 4.2.4 Sustainability and climate change considerations 4.3 Business category |
26 | 4.4 Overview of PE calculation and reporting work process |
27 | 4.5 Limitations |
28 | 4.6 PE data exchange between operators in benchmarking 5 Performance measures 5.1 General 5.2 Production efficiency 5.2.1 PE forecasting |
29 | 5.2.2 PE calculation and reporting 5.2.3 Initial production performance |
30 | 5.3 PE measurement |
31 | 5.4 PE calculation methodology 5.4.1 PE calculation formula 5.4.2 PE boundary conditions and reporting period 5.5 Injection efficiency calculation formula |
32 | 6 Production 6.1 General 6.2 Material balance |
33 | 6.3 Export – measured product |
34 | 6.4 Conversion factors for oil equivalents 6.5 Injection 6.6 Disposal – general 6.7 Disposal – flaring or venting of large volumes 6.7.1 Production facilities with a gas export route (to sales) 6.7.2 Production facilities with a gas injection route only |
35 | 6.7.3 Production facilities with no gas export route or other gas disposal routes 6.7.4 Flaring restrictions 6.8 Disposal – venting of small volumes 6.9 Fuel 6.10 Import |
36 | 6.11 Artificial lift 7 Production potential 7.1 General 7.2 Methods for determination of production potential 7.3 Structural maximum production potential (Method A) |
38 | 7.4 Achieved production potential (Method B) 7.5 Differences between Method A and Method B |
39 | 7.6 Adjusting the production potential |
41 | 7.7 Schedule delays |
42 | 7.8 Injection potential |
43 | 8 Production loss categories 8.1 General 8.2 Planned and unplanned events 8.3 Turnaround |
44 | 8.4 Modification 8.5 Pre-production 8.6 Flaring and venting of gas 8.7 Injection |
45 | 8.8 Accounting period |
46 | Annex A (normative) Production loss categorization |
57 | Annex B (informative) Performance measures for production availability |
60 | Annex C (normative) Taxonomy classification |
61 | Annex D (informative) Production loss subdivision with respect to system and equipment class |
67 | Annex E (informative) Examples |
79 | Bibliography |