FEMA P 348 508 2017
$42.90
FEMA P-348, Protecting Building Utilities from Flood Damage (2017)
Published By | Publication Date | Number of Pages |
FEMA | 2017 | 178 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | FEMA P-348 |
5 | Acknowledgements Acknowledgements Authors and Key Contributors Reviewers and Contributors |
6 | Technical Editing, Layout and Illustration |
7 | Table of Contents |
15 | Acronyms |
19 | Chapter 1 1.0 Introduction – Building Systems and Flood Hazards |
20 | 1.1 Intended Audience 1.2 How to Use this Publication 1.2.1 Basic Process |
21 | 1.2.2 Icons 1.3 Background 1.3.1 The National Flood Insurance Program (NFIP) |
22 | 1.3.2 Regulated Flood Hazard Areas |
25 | 1.3.3 Risk Assessment and Risk Reduction |
27 | 1.4 Flood Hazard Characteristics and Flood Loads 1.4.1 Flood Elevation or Flood Depth |
28 | 1.4.2 Flood Velocity 1.4.3 Wave Loads |
29 | 1.4.4 Other Impacts of Flooding |
31 | 1.5 NFIP Flood Insurance Considerations |
33 | Chapter 2 2.0 Regulatory Framework – NFIP Regulations and Building Codes 2.1 NFIP Regulations for Building Systems/Utilities |
34 | 2.2 Achieving Compliance – New Construction, Substantial Improvement and Substantial Damage |
35 | 2.3 Compliance Not Required – Non-Conforming Existing Buildings, No Substantial Improvement or Subst |
36 | 2.4 Building Codes |
38 | 2.5 Standards |
39 | 2.6 Building Occupancies |
40 | 2.6.1 Residential 2.6.2 Non-Residential |
43 | Chapter 3 3.0 Compliance and Mitigation Measures 3.1 Elevation and Relocation |
45 | 3.2 Component Protection |
48 | 3.2.1 Protection of Exposed Risers, Conduits, and Cables |
49 | 3.2.2 Protection of Duct Systems 3.2.3 Specially Designed Equipment |
50 | 3.3 Other Mitigation Options – Partial Protection Measures |
57 | Chapter 4 |
111 | Chapter 5 |
159 | Appendix A Appendix A – FEMA Assistance A.1 Increased Cost of Compliance Coverage |
161 | A.2.1 Stage 1: Mitigation Planning |
162 | A.2.2 Stage 2: Program Funding |
163 | A.2.3 Stage 3: Application Development |
164 | A.2.4 Stage 4: Project Implementation |
165 | A.2.5 Stage 5: Project Closeout A.3 The Public Assistance Program and Section 406 Hazard Mitigation Funding |
167 | A.4 FEMA Assistance Resources |
169 | Appendix B |
173 | Appendix C |
175 | Appendix D |