WRC volume 43 No. 03-04:1988
$27.95
Progress Reports Volume 43 No. 03-04
Published By | Publication Date | Number of Pages |
WRC | 1988 | 96 |
Contents
– Executive and Main Committee and Attachments, January 27, 1988
– PVRC Steering/Technical Committees on Piping Systems, January 25, 1988
– Technical Committee on Piping Systems, Task Group on Independent Support Motion, January 25, 1988
– PVRC Committee on Review and Simplification of Nuclear Codes and Standards, January 25-26, 1988
– Design Division, January 26, 1988
– Subcommittee on Reinforced Openings and External Loadings, January 25, 1988
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, January 26, 1988
– Subcommittee on Bolted Flanged Connections, January 26, 1988
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, January 25, 1988
– Subcommitteeon Shells and Ligaments, January 26, 1988
– Subcommittee on Elevated Temperature Design, January 26, 1988
– Materials and Fabrication Division, January 27, 1988
– Subcommittee on Nondestructive Examination of Components, January 26, 1988
– Subcommittee on Failure Modes of Components, January 26, 1988
– Subcommittee on Thermal and Mechanical Effects on Materials, January 26, 1988
– Subcommittee on Welds, January 27, 1988