{"id":353948,"date":"2024-10-20T01:00:36","date_gmt":"2024-10-20T01:00:36","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/icc-ipsdc-2021-1stptg\/"},"modified":"2024-10-26T01:11:45","modified_gmt":"2024-10-26T01:11:45","slug":"icc-ipsdc-2021-1stptg","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/icc\/icc-ipsdc-2021-1stptg\/","title":{"rendered":"ICC IPSDC 2021 1stptg"},"content":{"rendered":"
The 2021 IPSDC\u00ae companion to the IPC\u00ae includes provisions for design, installation, and inspection of private sewage disposal systems, and provides flexibility in the development of safe systems.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 2021 IPSDC\u00ae INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE\u00ae <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | 2021 IPSDC\u00ae INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE\u00ae TITLE PAGE <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | COPYRIGHT <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | PREFACE <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | ARRANGEMENT AND FORMAT OF THE 2021 IPSDC <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1\u2014SCOPE AND APPLICATION SECTION 101 SCOPE AND GENERAL REQUIREMENTS SECTION 102 APPLICABILITY <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | PART 2\u2014ADMINISTRATION AND ENFORCEMENT SECTION 103 CODE COMPLIANCE AGENCY SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | SECTION 105 APPROVAL <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | SECTION 106 PERMITS <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | SECTION 107 CONSTRUCTION DOCUMENTS <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | SECTION 108 NOTICE OF APPROVAL SECTION 109 TEMPORARY EQUIPMENT, SYSTEMS AND USES SECTION 110 SERVICE UTILITIES SECTION 111 INSPECTIONS <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | SECTION 112 MEANS OF APPEAL SECTION 113 BOARD OF APPEALS SECTION 114 VIOLATIONS <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 115 STOP WORK ORDER <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | CHAPTER 2 DEFINITIONS SECTION 201 GENERAL SECTION 202 GENERAL DEFINITIONS <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL SECTION 302 SPECIFIC LIMITATIONS SECTION 303 FLOOD HAZARD AREAS SECTION 304 ALTERNATIVE ENGINEERED DESIGN <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | CHAPTER 4 SITE EVALUATION AND REQUIREMENTS SECTION 401 GENERAL SECTION 402 SLOPE SECTION 403 SOIL BORINGS AND EVALUATION <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | SECTION 404 PERCOLATION OR PERMEABILITY EVALUATION <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | SECTION 405 SOIL VERIFICATION <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | SECTION 406 SITE REQUIREMENTS TABLE 406.1 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR SOIL ABSORPTION SYSTEMS <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | FIGURE 406.7.3 CONCEPTUAL DESIGN SKETCH FOR ALTERING SLOPES <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | CHAPTER 5 MATERIALS SECTION 501 GENERAL SECTION 502 IDENTIFICATION SECTION 503 PERFORMANCE REQUIREMENTS SECTION 504 TANKS <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | TABLE 504.1.2 TANK CAPACITY SECTION 505 PIPE, JOINTS AND CONNECTIONS <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | TABLE 505.1 PRIVATE SEWAGE DISPOSAL SYSTEM PIPE TABLE 505.1.1 DISTRIBUTION PIPE <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | SECTION 506 PROHIBITED JOINTS AND CONNECTIONS <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | CHAPTER 6 SOIL ABSORPTION SYSTEMS SECTION 601 GENERAL SECTION 602 SIZING SOIL ABSORPTION SYSTEMS SECTION 603 RESIDENTIAL SIZING SECTION 604 OTHER BUILDING SIZING EQUATION 6-1 SECTION 605 INSTALLATION OF CONVENTIONAL SOIL ABSORPTION SYSTEMS <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | TABLE 603.1 MINIMUM ABSORPTION AREA FOR ONE- AND TWO-FAMILY DWELLINGS TABLE 604.1(1) MINIMUM ABSORPTION AREA FOR OTHER THAN ONE- AND TWO-FAMILY DWELLINGS <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | TABLE 604.1(2) CONVERSION FACTOR <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | TABLE 604.1(2)\u2014continued CONVERSION FACTOR TABLE 605.3 EFFECTIVE SQUARE-FOOT ABSORPTION AREA FOR SEEPAGE PITS <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | CHAPTER 7 PRESSURE DISTRIBUTION SYSTEMS SECTION 701 GENERAL SECTION 702 DESIGN LOADING RATE TABLE 702.1 SOIL REQUIRED TABLE 702.2 DESIGN LOADING RATE SECTION 703 SYSTEM DESIGN <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | FORMULA 7-1 TABLE 703.3 HAZEN-WILLIAMS FRICTION FACTOR EQUATION 7-1 EQUATION 7-2 EQUATION 7-3 SECTION 704 BED AND TRENCH CONSTRUCTION SECTION 705 PUMPS <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | SECTION 706 DOSING TABLE 706.1 ESTIMATED VOLUME FOR VARIOUS DIAMETER PIPES <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | CHAPTER 8 TANKS SECTION 801 GENERAL SECTION 802 SEPTIC TANKS AND OTHER TREATMENT TANKS <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | TABLE 802.7.1 SEPTIC TANK CAPACITY FOR ONE AND TWO-FAMILY DWELLINGS TABLE 802.7.2 ADDITIONAL CAPACITY FOR OTHER BUILDINGS <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | TABLE 802.7.2\u2014continued ADDITIONAL CAPACITY FOR OTHER BUILDINGS TABLE 802.8 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR TREATMENT TANKS <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | TABLE 802.11.1 PUMP CHAMBER SIZES SECTION 803 MAINTENANCE AND SLUDGE DISPOSAL SECTION 804 CHEMICAL RESTORATION SECTION 805 HOLDING TANKS TABLE 805.2 MINIMUM LIQUID CAPACITY OF HOLDING TANKS <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | CHAPTER 9 MOUND SYSTEMS SECTION 901 GENERAL SECTION 902 SOIL AND SITE REQUIREMENTS TABLE 902.2 MINIMUM SOIL DEPTHS FOR MOUND SYSTEM INSTALLATION SECTION 903 SYSTEM DESIGN <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | EQUATION 9-1 EQUATION 9-2 EQUATION 9-3 EQUATION 9-4 <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | TABLE 903.1(1) DESIGN CRITERIA FOR A MOUND FOR A ONE-BEDROOM HOME ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(2) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | TABLE 903.1(3) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(4) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | TABLE 903.1(4)\u2014continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(5) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | TABLE 903.1(6) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(7) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | TABLE 903.1(7)\u2014continued DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(8) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | TABLE 903.1(9) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(10) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | TABLE 903.1(11) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(12) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | TABLE 903.1(12)\u2014continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE EQUATION 9-5 EQUATION 9-6 EQUATION 9-7 EQUATION 9-8 TABLE 903.5.5 DOWNSLOPE AND UPSLOPE WIDTH CORRECTIONS FOR MOUNDS ON SLOPING SITES TABLE 903.6 INFILTRATIVE CAPACITY OF NATURAL SOIL EQUATION 9-9 EQUATION 9-10 <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | EQUATION 9-11 EQUATION 9-12 SECTION 904 CONSTRUCTION TECHNIQUES <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | CHAPTER 10 CESSPOOLS SECTION 1001 GENERAL <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | CHAPTER 11 RESIDENTIAL WASTEWATER SYSTEMS SECTION 1101 GENERAL <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | CHAPTER 12 INSPECTIONS SECTION 1201 GENERAL SECTION 1202 INSPECTIONS <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | CHAPTER 13 NONLIQUID SATURATED TREATMENT SYSTEMS SECTION 1301 GENERAL <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | CHAPTER 14 REFERENCED STANDARDS ASTM <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | CISPI CSA ICC NSF <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | UL <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS A101 SYSTEM LAYOUTS FIGURE A101.1(1) (SECTION 403.1.1) EXAMPLE OF SOIL-BORING LOCATIONS FOR TWO CONTIGUOUS ABSORPTION AREAS FIGURE A101.1(2) (SECTION 405.2.4) MONITORING WELL DESIGN <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | FIGURE A101.1(3) (SECTION 406.6.7) DESIGN OF FILLED AREA SYSTEM FIGURE A101.1(4) (SECTION 605.7) OBSERVATION PIPE <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | FIGURE A101.1(5) (SECTION 703.1) PRESSURE DISTRIBUTION SYSTEM DESIGN FIGURE A101.1(6) (SECTION 903.1) MOUND USING THREE TRENCHES FOR ABSORPTION AREA <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | FIGURE A101.1(7) (SECTION 903.1) PLAN VIEW OF MOUND USING A BED FOR THE ABSORPTION AREA FIGURE A101.1(8) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING THREE TRENCHES FOR THE ABSORPTION AREA <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | FIGURE A101.1(9) (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING A BED FOR THE ABSORPTION AREA FIGURE A101.1(10) (SECTION 903.1) DISTRIBUTION PIPE LAYOUT <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | APPENDIX B TABLES FOR PRESSURE DISTRIBUTION SYSTEMS B101 PRESSURE DISTRIBUTION SYSTEMS TABLE B101.1(1) REQUIRED DISTRIBUTION PIPE DIAMETERS FOR VARIOUS HOLE DIAMETERS, HOLE SPACINGS AND DISTRIBUTION PIPE LENGTHS (SCHEDULE 40 PLASTIC PIPE) <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | FIGURE B101.1(1) DISTRIBUTION PIPE DISCHARGE RATEa TABLE B101.1(2) RECOMMENDED MANIFOLD DIAMETERS FOR VARIOUS MANIFOLD LENGTHS, NUMBER OF DISTRIBUTION PIPES AND DISTRIBUTION PIPE DISCHARGE RATES (SCHEDULE 40 PLASTIC PIPE) <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | FIGURE B101.1(2) PUMP DOSING RATEa TABLE B101.1(3) FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | TABLE B101.1(3)\u2014continued FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | FIGURE B101.1(3) MINIMUM DOSE VOLUME BASED ON PIPE SIZE, LENGTH AND NUMBERaFor <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | APPENDIX C BOARD OF APPEALS [A] C101 GENERAL <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | INDEX <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | ICC EVALUATION SERVICE <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | ICC LEARNING CENTER <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | ICC ASSESSMENT CENTER <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | ICC DIGITAL CODES LIBRARY <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" International Private Sewage Disposal Code, 2nd Printing<\/b><\/p>\n |