{"id":399890,"date":"2024-10-20T04:46:04","date_gmt":"2024-10-20T04:46:04","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c2-2002\/"},"modified":"2024-10-26T08:34:02","modified_gmt":"2024-10-26T08:34:02","slug":"ieee-c2-2002","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c2-2002\/","title":{"rendered":"IEEE C2-2002"},"content":{"rendered":"

New IEEE Standard – Superseded. This standard covers basic provisions for safeguarding of persons from hazards arising from the installation, operation, or maintenance of 1) conductors and equipment in electric supply stations, and 2) overhead and underground electric supply and communication lines. It also includes work rules for the construction, maintenance, and operation of electric supply and communication lines and equipment. The standard is applicable to the systems and equipment operated by utilities, or similar systems and equipment, of an industrial establishment or complex under the control of qualified persons. This standard consists of the introduction, definitions, grounding rules, list of referenced and bibliographic documents, and Parts 1, 2, 3, and 4 of the 2002 Edition of the National Electrical Safety Code.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nNational Electrical Safety Code <\/td>\n<\/tr>\n
3<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nStandards Committee Membership <\/td>\n<\/tr>\n
11<\/td>\nContents <\/td>\n<\/tr>\n
33<\/td>\nLetter Symbols for Units <\/td>\n<\/tr>\n
35<\/td>\nSection 1. Introduction to the National Electrical Safety Code <\/td>\n<\/tr>\n
38<\/td>\nSection 2. Definitions of Special Terms <\/td>\n<\/tr>\n
48<\/td>\nSection 3. References <\/td>\n<\/tr>\n
50<\/td>\nSection 9. Grounding Methods for Electric Supply and Communications Facilities <\/td>\n<\/tr>\n
61<\/td>\nPart 1. Rules for the Installation and Maintenance of Electric Supply Stations and Equipment
Section 10. Purpose and Scope of Rules <\/td>\n<\/tr>\n
62<\/td>\nSection 11. Protective Arrangements in Electric Supply Stations <\/td>\n<\/tr>\n
68<\/td>\nSection 12. Installation and Maintenance of Equipment <\/td>\n<\/tr>\n
83<\/td>\nSection 13. Rotating Equipment <\/td>\n<\/tr>\n
84<\/td>\nSection 14. Storage Batteries <\/td>\n<\/tr>\n
85<\/td>\nSection 15. Transformers and Regulators <\/td>\n<\/tr>\n
87<\/td>\nSection 16. Conductors <\/td>\n<\/tr>\n
88<\/td>\nSection 17. Circuit Breakers,Reclosers,Switches,and Fuses <\/td>\n<\/tr>\n
89<\/td>\nSection 18. Switchgear and Metal-Enclosed Bus <\/td>\n<\/tr>\n
92<\/td>\nSection 19. Surge Arresters <\/td>\n<\/tr>\n
93<\/td>\nPart 2. Safety Rules for the Installation and Maintenance of Overhead Electric Supply and Communication Lines
Section 20. Purpose,Scope,and Application of Rules <\/td>\n<\/tr>\n
94<\/td>\nSection 21. General Requirements <\/td>\n<\/tr>\n
98<\/td>\nSection 22. Relations Between Various Classes of Lines and Equipment <\/td>\n<\/tr>\n
103<\/td>\nSection 23. Clearances <\/td>\n<\/tr>\n
189<\/td>\nSection 24. Grades of Construction <\/td>\n<\/tr>\n
195<\/td>\nSection 25. Loadings for Grades B and C <\/td>\n<\/tr>\n
209<\/td>\nSection 26. Strength Requirements <\/td>\n<\/tr>\n
221<\/td>\nSection 27. Line Insulation <\/td>\n<\/tr>\n
225<\/td>\nPart 3. Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines
Section 30. Purpose,Scope,and Application of Rules <\/td>\n<\/tr>\n
226<\/td>\nSection 31. General Requirements Applying to Underground Lines <\/td>\n<\/tr>\n
228<\/td>\nSection 32. Underground Conduit Systems <\/td>\n<\/tr>\n
234<\/td>\nSection 33. Supply Cable <\/td>\n<\/tr>\n
235<\/td>\nSection 34. Cable in Underground Structures <\/td>\n<\/tr>\n
238<\/td>\nSection 35. Direct-Buried Cable <\/td>\n<\/tr>\n
244<\/td>\nSection 36. Risers <\/td>\n<\/tr>\n
245<\/td>\nSection 37. Supply Cable Terminations <\/td>\n<\/tr>\n
246<\/td>\nSection 38. Equipment <\/td>\n<\/tr>\n
248<\/td>\nSection 39. Installation in Tunnels <\/td>\n<\/tr>\n
249<\/td>\nPart 4. Rules for the Operation of Electric Supply and Communications Lines and Equipment <\/td>\n<\/tr>\n
250<\/td>\nSection 41. Supply and Communications Systems \u2014 Rules for Employers <\/td>\n<\/tr>\n
252<\/td>\nSection 42. General Rules for Employees <\/td>\n<\/tr>\n
258<\/td>\nSection 43. Additional Rules for Communications Employees <\/td>\n<\/tr>\n
260<\/td>\nSection 44. Additional Rules for Supply Employees <\/td>\n<\/tr>\n
277<\/td>\nAppendix A <\/td>\n<\/tr>\n
288<\/td>\nAppendix B <\/td>\n<\/tr>\n
291<\/td>\nIndex <\/td>\n<\/tr>\n
313<\/td>\nProcedure for Revising the National Electrical Safety Code <\/td>\n<\/tr>\n
315<\/td>\nFORM FOR CHANGE PROPOSALS ON THE NATIONAL ELECTRICAL SAFETY CODE <\/td>\n<\/tr>\n
316<\/td>\nTime Schedule for the Next Revision of the National Electrical Safety Code <\/td>\n<\/tr>\n
317<\/td>\nWorking Group Assignments <\/td>\n<\/tr>\n
320<\/td>\nTentative Interim Amendment 2002-1 <\/td>\n<\/tr>\n
321<\/td>\nTentative Interim Amendment 2002-2 <\/td>\n<\/tr>\n
322<\/td>\nFor the Latest NESC Developments <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

National Electrical Safety Code 2002 Edition<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2002<\/td>\n322<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":399897,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-399890","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/399890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/399897"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=399890"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=399890"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=399890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}