{"id":452510,"date":"2024-10-20T09:24:56","date_gmt":"2024-10-20T09:24:56","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-143-2012-2\/"},"modified":"2024-10-26T17:31:15","modified_gmt":"2024-10-26T17:31:15","slug":"ieee-c57-143-2012-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-143-2012-2\/","title":{"rendered":"IEEE C57.143-2012"},"content":{"rendered":"
New IEEE Standard – Active. Identification of the key parameters that can be monitored for obtaining an indication of the condition of liquid-immersed transformers is covered by this guide. It also covers risk\/benefit analysis, sensor application, and monitoring systems application. This guide does not cover interpretation of monitoring results.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.143-2012 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata Patents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Important Notice 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2. Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4. Surveillance needs of high-voltage transformers and accessories 4.1 General 4.2 Power transformers <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Instrument transformers <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.4 Bushings <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.5 Load tap changers <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5. Monitored parameters 5.1 General 5.2 Dissolved gas-in-oil analysis <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.3 Moisture in oil <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.4 Partial discharge <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5.5 Transformer temperatures 5.6 Winding temperatures <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 5.7 Load current and voltage <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5.8 Insulation power factor 5.9 Pump\/Fan operation <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.10 Load tap changer (LTC) operations 5.11 Conservator membrane <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 6. Monitoring systems and equipment 6.1 Monitoring system description 6.2 Sensors <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.3 Hardware specification <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.4 Signals 6.5 Signal acquisition <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.6 Application of sensors <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.7 Installation considerations <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 6.8 Control function 6.9 Selecting communications hardware and protocols <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 6.10 Data application <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.11 Selection criterion for on-line monitoring system 6.12 On-line diagnostics for transformers <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 7. Cost benefits 7.1 Introduction <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 7.2 Inspection and maintenance costs <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 7.3 Failure resolution cost <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 7.4 Reinforcement of overload capability <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 7.5 Deferring transformer replacement <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 7.6 Monitoring system cost 7.7 Global evaluation <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex B (informative) Bushing power factor and capacitance B.1 Introduction B.2 Current sum method <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | B.3 Tan \u03b4 method B.4 Relative Power Factor\/Tan \u03b4 <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Annex C (informative) Partial discharge: electrical and acoustic methods C.1 Introduction C.2 Electrical PD <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | C.3 Acoustic PD <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Annex D (informative) Direct winding temperature D.1 Fluorescence decay time <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | D.2 Distributed temperature sensor <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Annex E (informative) Communications protocols for on-line monitoring equipment E.1 Introduction E.2 The role and requirements of a protocol <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | E.3 Protocol selection <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | E.4 Recommended practice <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | E.5 Communication hardware considerations <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers and Components<\/b><\/p>\n |