Shopping Cart

No products in the cart.

ACI 548.13M 14:2014 Edition

$23.02

548.13M-14 Metric Specification for Bonding Fresh Concrete to Hardened Concrete with a Multi-Component Epoxy Adhesive

Published By Publication Date Number of Pages
ACI 2014 12
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This specification describes the work of bonding fresh concrete to hardened concrete with a multi-component epoxy adhesive, such as defined for this purpose in ASTM C881/C881M. Included are controls for adhesive labeling, storage, handling, surface evaluation and preparation, mixing and application, inspection, safety, quality control, and testing. Keywords: adhesive; bond; construction; epoxy resins; fresh concretes; quality control; repair; safety; surface. The official version of this ACI document uses inch-pound units. A conversion of an ACI document into SI units is for the convenience of users. Care has been taken to ensure that the conversion is correct; however, ACI does not guarantee its accuracy. Official interpretation of this ACI document shall be based only on the U.S. customary units.

PDF Catalog

PDF Pages PDF Title
3 TITLE PAGE
TITLE PAGE
4 PART 1—GENERAL
PART 1—GENERAL
1.1—Scope
1.1—Scope
1.2—Interpretation
1.2—Interpretation
1.3—Definitions
1.3—Definitions
1.4—Referenced standards
1.4—Referenced standards
1.5—Submittals
1.5—Submittals
1.6—Product delivery, storage, and handling
1.6—Product delivery, storage, and handling
5 1.7—Project conditions
1.7—Project conditions
PART 2—PRODUCTS
PART 2—PRODUCTS
2.1—Materials
2.1—Materials
PART 3—EXECUTION
PART 3—EXECUTION
3.1—Preparation
3.1—Preparation
3.2––Inspection
3.2––Inspection
3.3––Adhesive mixtures
3.3––Adhesive mixtures
3.4––Adhesive application and concrete placement
3.4––Adhesive application and concrete placement
3.5––Cleanup
3.5––Cleanup
3.6—Safety
3.6—Safety
3.7––Field quality performance requirements
3.7––Field quality performance requirements
6 NOTES TO SPECIFIER
NOTES TO SPECIFIER
General notes
General notes
FOREWORD TO CHECKLIST
FOREWORD TO CHECKLIST
7 MANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
ACI 548.13M 14
$23.02