Shopping Cart

No products in the cart.

BS EN 60079-30-2:2017:2018 Edition

$215.11

Explosive atmospheres – Electrical resistance trace heating. Application guide for design, installation and maintenance

Published By Publication Date Number of Pages
BSI 2018 74
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 60079 provides guidance for the application of electrical resistance trace heating systems in areas where explosive atmospheres may be present, with the exclusion of those classified as requiring EPL Ga/Da (traditional relationship to Zone 0 and Zone 20 respectively). It provides recommendations for the design, installation, maintenance and repair of trace heating systems including associated control and monitoring equipment. It does not cover devices that operate by induction heating, skin effect heating or direct pipeline heating, nor those intended for stress relieving.

PDF Catalog

PDF Pages PDF Title
2 undefined
5 Annex ZA(normative)Normative references to international publicationswith their corresponding European publications
6 CONTENTS
10 FOREWORD
14 1 Scope
2 Normative references
3 Terms and definitions
4 Application considerations
4.1 General
15 4.2 Corrosive areas
4.3 Process temperature accuracy
4.3.1 Type I
4.3.2 Type II
4.3.3 Type III
4.4 Installation considerations
16 5 Thermal insulation
5.1 General
5.2 Selection of insulating material
17 5.3 Selection of weather barrier (cladding)
5.4 Selection of economical thickness to provide optimum trace heating design
18 5.5 Double insulation
19 Figures
Figure 1 – Thermal insulation – Weather-barrier installation
20 Figure 2 – Typical temperature profile
21 6 System design
6.1 General
6.2 Purpose of, and major requirement for, trace heating
22 6.3 Training
6.4 Selection of trace heater
6.4.1 General
6.4.2 Site-fabricated trace heaters
23 6.4.3 Specific types of trace heating
6.5 Maximum temperature determination
6.5.1 General
6.5.2 PTC characteristic
24 6.5.3 Stabilized design
6.5.4 Controlled design
6.6 Heat up and cool down considerations
6.7 Design information
6.7.1 Design information documentation
25 6.7.2 Isometric or trace heater configuration line lists and load charts
26 6.8 Power system
6.9 Earthing requirements
27 6.10 Earth-fault protection of equipment
6.11 Start-up at minimum ambient temperatures
6.12 Long trace heater runs
6.13 Flow pattern analysis
28 Figure 3 – Flow pattern analysis example
29 6.14 Dead-leg control technique
6.15 Chimney effect
Figure 4 – Bypass example
30 6.16 Safety shower and eyewash station design requirements
7 Control and monitoring
7.1 General
31 7.2 Mechanical controllers
7.3 Electronic controllers
7.4 Application suitability
7.5 Location of controllers
32 7.6 Location of sensors
7.7 Alarm considerations
7.7.1 General
7.7.2 Trace heating circuit alarm
33 7.7.3 Temperature alarms
7.7.4 Other alarms
7.7.5 Integrated control
8 Recommendations for installation
8.1 General
34 8.2 Preparatory work
8.2.1 General
8.2.2 Scheduling and coordination
8.2.3 Confirmation of equipment
8.2.4 Receiving materials
8.2.5 Warehousing and handling
8.2.6 Personnel aspects
8.3 Installation of trace heating circuits
8.3.1 Coordination and equipment verification
35 8.3.2 Pre-installation testing and design verification
8.3.3 Visual examination
8.3.4 Insulation resistance test
8.3.5 Component substitution
8.3.6 Location of power supply
36 8.3.7 Installation of trace heaters
Tables
Table 1 – Pre-installation checks
38 8.3.8 Connections and terminations
40 8.4 Installation of control and monitoring equipment
8.4.1 General
8.4.2 Verification of equipment suitability
8.4.3 Temperature controller and monitoring devices
8.4.4 Sensor considerations
42 Figure 5 – Typical installation of control sensor and sensor for temperature limiting control
Figure 6 – Limiting device sensor on sheath of trace heater
43 Figure 7 – Limiting device sensor as artificial hot spot
44 8.4.5 Controller operation, calibration, and access
8.4.6 Necessary modifications
8.5 Installation of thermal insulation system (see also Clause 5)
8.5.1 General
8.5.2 Preparatory work
8.5.3 Installation of the thermal insulation materials
45 8.5.4 Cladding
8.5.5 Field (site work) circuit insulation resistance test
8.5.6 Visual inspection
46 8.5.7 Documentation
8.6 Installation of distribution wiring and coordination with branch circuits
8.6.1 General
8.6.2 Earth-fault protective device
8.6.3 Circuit protective device
8.6.4 Tagging/Identification
8.7 Commissioning
8.7.1 Pre-commissioning check
47 8.7.2 Functional check and final documentation
48 9 Maintenance
9.1 General
9.2 Fault location
9.3 Fault rectification
49 10 Repairs
10.1 General
10.2 Practicability of repair to electric trace heaters
10.2.1 Mechanical damage
10.2.2 Damage due to corrosion
10.2.3 Damage due to overheating
10.3 Repair techniques for electrical trace heaters
10.3.1 General
50 10.3.2 In-line splice
10.3.3 Connection via junction box
10.4 Earthing
10.5 Testing
51 Annexes
Annex A (informative) Example of design data record
Table A.1 – Example of design data record
52 Annex B (informative) Checklist for installation requirements
Table B.1 – Example of pre-commissioning check and trace heater installation record
54 Annex C (informative) Example of trace heater commissioning record
Table C.1 – Example of trace heater commissioning record
56 Annex D (informative) Example of maintenance schedule and log record
Table D.1 – Example of maintenance schedule and log record
58 Annex E (informative) Pipe heat loss considerations – Heat loss formula and example calculations
59 Figure E.1 – Assumed temperature gradients
64 Annex F (informative) Vessel heat loss considerations
F.1 General
F.2 Insulation heat loss (Qins)
65 F.3 Slab surface areas (Qslab)
F.4 Support heat loss (Qsupt)
66 F.5 Manhole heat loss (Qmanhole)
F.6 Convection coefficient formulae
F.6.1 General
F.6.2 Free convection, nonfluid surface, any orientation (hi, hco, ho)
67 F.6.3 Forced convection, any orientation (h0)
F.6.4 Radiation component, all coefficients (hf, hi, hco, ho)
69 Annex G (informative) Heat up and cool down considerations
G.1 Heat up
70 G.2 Cool down
72 Annex H (informative) Method to determine equivalent thicknesses of insulating cements
73 Bibliography
BS EN 60079-30-2:2017
$215.11