BSI PAS 8811:2017
$79.47
Temporary works. Major infrastructure client procedures. Code of practice
Published By | Publication Date | Number of Pages |
BSI | 2017 | 42 |
This PAS gives recommendations on major infrastructure client procedures for all temporary works and temporary conditions of permanent works during construction. It covers processes, roles, responsibilities and competences, and provides example pro forma documentation.
The aim of this PAS is to establish a unified approach to client involvement in temporary works across all stages (e.g. defining requirements, procurement, installation, use and removal of temporary works structures) and eliminate unnecessary procedures and conflicts in order to achieve clarity and minimize delays during compliance and approvals processes and other necessary procedures.
This PAS is designed to complement BS 5975, Code of practice for temporary works and the permissible stress design of falsework with the same aim of controlling risk and ensuring adequate procedures. It concentrates on those client activities which are not covered by BS 5975.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | Contents |
4 | Foreword |
6 | 0 Introduction |
7 | 1 Scope 2 Normative references |
8 | 3 Terms and definitions |
13 | 4 Client management of temporary works |
23 | 5 Design and execution risk management |
28 | 6 Client-appointed permanent works designers and principal designer |
30 | 7 Assessing competencies of contractors in temporary works and buildability matters |
31 | Annex A (normative) Temporary works standard forms |
40 | Bibliography |