IEEE C37.59-2018
$47.67
IEEE Standard for Requirements for Conversion of Power Switchgear Equipment
Published By | Publication Date | Number of Pages |
IEEE | 2018 |
Revision Standard – Active. Directions and requirements are provided for the conversion of qualified power switchgear equipment. Examples such as low-voltage power circuit breakers; high-voltage outdoor, and medium-voltage indoor drawout power circuit breakers; medium-voltage fused contactors; medium-voltage ground and test devices; medium-voltage fused load interrupter switches; and metal-enclosed switchgear are covered in this standard. Existing design standards are referenced with appropriate guidance on design testing necessary to design-verify the conversions. Reconditioning, which concerns the maintenance of existing equipment without alteration, is not covered.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C37.59ā¢-2018 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
7 | Participants |
9 | Introduction |
11 | Contents |
12 | 1.āOverview 1.1āGeneral |
13 | 1.2āScope 1.3āOther conversions 1.4āWord usage 2.āNormative references |
15 | 3.āDefinitions |
17 | 4.āService conditions 5.āRatings 6.āConversion and testing 6.1āGeneral |
18 | 6.2āCircuit breakers and related conversions |
28 | 6.3āSwitchgear vertical sections |
29 | 6.4āMetal-enclosed interrupter switchgear conversions |
31 | 6.5āConversion of switchgear for arc-resistant performance |
33 | 6.6āModifications of arc-resistant switchgear 6.7āConversions using a compartment adaptor |
35 | 6.8āConversions related to energy storage systems 6.9āAddition of inspection windows and ports to switchgear |
36 | 7.āProduction testing 8.āNameplates and third party labels 8.1āNameplates |
37 | 8.2āConverted equipment door labels 8.3āThird-party labels |
38 | 9.āManuals 10.āDesign verification form |
39 | AnnexĀ A (informative) Clarification of conversion processes A.1āIntroduction A.2āScope A.3āCircuit breakers |
43 | A.4āSwitchgear vertical sections |
44 | A.5āAdditional MOC switch design verification |
45 | A.6āTypical information to be documented for a conversion |
50 | AnnexĀ B (informative) Bibliography |
57 | Back cover |