Shopping Cart

No products in the cart.

ISA TR77.30.01-2015

$22.75

Power Plant Control System Dynamic Performance Test Methods and Procedures

Published By Publication Date Number of Pages
ISA 2015-07-05 54
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Full Description

This technical report defines test procedures, data collection requirements and data analysis methods for determining and reporting the dynamic performance of control systems for boiler and turbine control systems on generating units with a rated capacity of 25 MW or greater or a boiler steam flow greater than 25 kg/s (200,000 lb/hr). This technical report covers aspects of dynamic plant operation including constant load operation, normal load ramping operation, grid regulation operation, and response to frequency upset, load runback, and load rundown operation.

The purpose of this technical report is to establish dynamic performance criteria for power plant control systems by specifying a consistent means of evaluating control system performance necessary to comply with contractual specifications and other dynamic performance requirements.

ISA TR77.30.01-2015
$22.75