{"id":140817,"date":"2024-10-19T08:10:46","date_gmt":"2024-10-19T08:10:46","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-0-2-2015\/"},"modified":"2024-10-25T00:23:36","modified_gmt":"2024-10-25T00:23:36","slug":"ashrae-guideline-0-2-2015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-0-2-2015\/","title":{"rendered":"ASHRAE Guideline 0.2 2015"},"content":{"rendered":"

New ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is the comprehensive description of a systematic quality-oriented process that improves the performance and sustainability of existing facilities. This road map includes planning, assessing, investigating, implementing, verifying, and documenting performance to meet defined and optimized operational requirements. The step-by-step process guides owners and facility managers through the process of getting the best effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. This guideline was developed by experienced industry practitioners and includes best practices developed through years of successful facility improvements. Guideline 0.2 is intended for use by owners, facility decision makers and commissioning providers who are focused on optimizing the operation of their facilities and systems to achieve specific goals as identified in the Owner\u2019s “Current Facility Requirements.”<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nASHRAE Guideline 0.2-2015 <\/td>\n<\/tr>\n
3<\/td>\nCONTENTS <\/td>\n<\/tr>\n
4<\/td>\nFOREWORD <\/td>\n<\/tr>\n
5<\/td>\n1. PURPOSE
2. SCOPE
3. DEFINITIONS <\/td>\n<\/tr>\n
6<\/td>\n4. PROCESS OVERVIEW <\/td>\n<\/tr>\n
8<\/td>\n5. MULTIPLE-FACILITY PLANNING <\/td>\n<\/tr>\n
11<\/td>\n6. ASSESSMENT <\/td>\n<\/tr>\n
17<\/td>\n7. INVESTIGATION <\/td>\n<\/tr>\n
23<\/td>\n8. IMPLEMENTATION <\/td>\n<\/tr>\n
27<\/td>\n9. HAND-OFF <\/td>\n<\/tr>\n
29<\/td>\n10. ONGOING COMMISSIONING <\/td>\n<\/tr>\n
32<\/td>\nINFORMATIVE ANNEX A\u2014GUIDE FOR DEVELOPING SUPPLEMENTARY TECHNICAL GUIDELINES FOR THE COMMISSIONING PROCESS FOR EXISTING BUILDINGS AND ASSEMBLIES <\/td>\n<\/tr>\n
36<\/td>\nINFORMATIVE ANNEX B\u2014FLOWCHARTS FOR THE COMMISSIONING PROCESS FOR EXISTING BUILDINGS <\/td>\n<\/tr>\n
39<\/td>\nINFORMATIVE ANNEX C1\u2014COST AND BENEFITS OF THE COMMISSIONING PROCESS FOR SYSTEMS IN EXISTING BUILDINGS AND ASSEMBLIES <\/td>\n<\/tr>\n
41<\/td>\nINFORMATIVE ANNEX C2\u2014DIFFERENCES BETWEEN THE EXISTING-BUILDING COMMISSIONING PROCESS, AN ENERGY AUDIT, AND A BUILDING TUNE-UP <\/td>\n<\/tr>\n
44<\/td>\nINFORMATIVE ANNEX D\u2014DOCUMENTATION MATRIX FOR COMMISSIONING PROCESS FOR EXISTING BUILDINGS AND ASSEMBLIES <\/td>\n<\/tr>\n
45<\/td>\nINFORMATIVE ANNEX E\u2014REQUEST FOR QUALIFICATIONS AND TEAM SELECTION <\/td>\n<\/tr>\n
47<\/td>\nINFORMATIVE ANNEX F\u2014ROLES AND RESPONSIBILITIES <\/td>\n<\/tr>\n
49<\/td>\nINFORMATIVE ANNEX G\u2014EXISTING-BUILDING COMMISSIONING PLANS <\/td>\n<\/tr>\n
50<\/td>\nINFORMATIVE ANNEX H\u2014EXISTING-BUILDING COMMISSIONING PROCESS PROGRAM PLAN FOR MULTIPLE FACILITIES <\/td>\n<\/tr>\n
52<\/td>\nINFORMATIVE ANNEX I\u2014CURRENT FACILITY REQUIREMENTS WORKSHOP <\/td>\n<\/tr>\n
55<\/td>\nINFORMATIVE ANNEX J\u2014CURRENT FACILITY REQUIREMENTS <\/td>\n<\/tr>\n
58<\/td>\nINFORMATIVE ANNEX K\u2014EXISTING-BUILDING DOCUMENTATION AND RECORDS <\/td>\n<\/tr>\n
59<\/td>\nINFORMATIVE ANNEX L\u2014EXISTING-BUILDING COMMISSIONING PROCESS REPORT <\/td>\n<\/tr>\n
60<\/td>\nINFORMATIVE ANNEX L1\u2014ASSESSMENT REPORT <\/td>\n<\/tr>\n
62<\/td>\nINFORMATIVE ANNEX L2\u2014INVESTIGATION REPORT <\/td>\n<\/tr>\n
64<\/td>\nINFORMATIVE ANNEX L3\u2014IMPLEMENTATION REPORT <\/td>\n<\/tr>\n
65<\/td>\nINFORMATIVE ANNEX L4\u2014MEASUREMENT AND VERIFICATION REPORT <\/td>\n<\/tr>\n
66<\/td>\nINFORMATIVE ANNEX L5\u2014TRAINING <\/td>\n<\/tr>\n
70<\/td>\nINFORMATIVE ANNEX 6\u2014LESSONS-LEARNED WORKSHOP <\/td>\n<\/tr>\n
71<\/td>\nINFORMATIVE ANNEX M\u2014SYSTEMS MANUAL <\/td>\n<\/tr>\n
73<\/td>\nINFORMATIVE ANNEX M1\u2014FACILITY GUIDE <\/td>\n<\/tr>\n
75<\/td>\nINFORMATIVE ANNEX N\u2014ONGOING COMMISSIONING REPORT <\/td>\n<\/tr>\n
76<\/td>\nINFORMATIVE ANNEX O\u2014EXISTING-BUILDING COMMISSIONING PROCESS RESOURCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASHRAE Guideline 0.2-2015 — Commissioning Process for Existing Systems and Assemblies<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2015<\/td>\n80<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":140820,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-140817","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/140817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/140820"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=140817"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=140817"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=140817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}