{"id":161062,"date":"2024-10-19T09:40:28","date_gmt":"2024-10-19T09:40:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-548-13-14\/"},"modified":"2024-10-25T01:59:02","modified_gmt":"2024-10-25T01:59:02","slug":"aci-548-13-14","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-548-13-14\/","title":{"rendered":"ACI 548.13 14"},"content":{"rendered":"
This specification describes the work of bonding fresh concrete to hardened concrete with a multi-component epoxy adhesive, such as defined for this purpose in ASTM C881\/C881M. Included are controls for adhesive labeling, storage, handling, surface evaluation and preparation, mixing and application, inspection, safety, quality control, and testing. Keywords: adhesive; bond; construction; epoxy resins; fresh concretes; quality control; repair; safety; surface.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | CONTENTS CONTENTS <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | PART 1\u2014 GENERAL PART 1\u2014 GENERAL 1.1\u2014Scope 1.1\u2014Scope 1.2\u2014Interpretation 1.2\u2014Interpretation 1.3\u2014Definitions 1.3\u2014Definitions 1.4\u2014Referenced standards 1.4\u2014Referenced standards 1.5\u2014Submittals 1.5\u2014Submittals 1.6\u2014Product delivery, storage, and handling 1.6\u2014Product delivery, storage, and handling <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.7\u2014Project conditions 1.7\u2014Project conditions PART 2\u2014 PRODUCTS PART 2\u2014 PRODUCTS 2.1\u2014Materials 2.1\u2014Materials PART 3\u2014 EXECUTION PART 3\u2014 EXECUTION 3.1\u2014Preparation 3.1\u2014Preparation 3.2\u2013\u2013Inspection 3.2\u2013\u2013Inspection 3.3\u2013\u2013Adhesive mixtures 3.3\u2013\u2013Adhesive mixtures 3.4\u2013\u2013Adhesive application and concrete placement 3.4\u2013\u2013Adhesive application and concrete placement 3.5\u2013\u2013Cleanup 3.5\u2013\u2013Cleanup 3.6\u2014Safety 3.6\u2014Safety 3.7\u2013\u2013Field quality performance requirements 3.7\u2013\u2013Field quality performance requirements <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | NOTES TO SPECIFIER NOTES TO SPECIFIER General notes General notes FOREWORD TO CHECKLIST FOREWORD TO CHECKLIST <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | MANDATORY REQUIREMENTS CHECKLIST MANDATORY REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 548.13-14 – Specification for Bonding Fresh Concrete to Hardened Concrete with a Multi-Component Epoxy Adhesive<\/b><\/p>\n |