{"id":335487,"date":"2024-10-19T23:25:13","date_gmt":"2024-10-19T23:25:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16601-402014\/"},"modified":"2024-10-25T22:22:59","modified_gmt":"2024-10-25T22:22:59","slug":"bs-en-16601-402014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16601-402014\/","title":{"rendered":"BS EN 16601-40:2014"},"content":{"rendered":"
The scope of this standard is to describe the processes and provide the requirements for managing the information\/documentation and configuration of products within a space programme or project.<\/p>\n
The requirements specified herein apply to, and affect the supplier and customer at all levels.<\/p>\n
This standard may be tailored for the specific characteristics and constraints of a space project in conformance with ECSS-S-ST-00.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
9<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms from other standards 3.2 Terms specific to the present standard <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3.3 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4 Configuration management principles 4.1 Overview 4.1.1 Configuration and information\/documentation activities 4.1.2 Configuration management process and objectives <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.1.3 Information\/documentation management process and objectives <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.2 Management and planning 4.2.1 Configuration management plan 4.2.2 Configuration management interfaces <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.3 Implementation of configuration management 4.3.1 Overview <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.3.2 Configuration identification 4.3.2.1 Overview <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.3.2.2 Configuration item <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.3.2.3 Selection of configuration items 4.3.2.4 Configuration baseline <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.3.2.5 Identification marking <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.3.2.6 Digital file and media identification 4.3.3 Configuration control 4.3.3.1 Overview <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 4.3.3.2 Change procedure 4.3.3.3 Configuration control board <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.3.3.4 Classification of changes and departures 4.3.3.5 Interface control 4.3.4 Configuration status accounting 4.3.4.1 Overview <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.3.4.2 As\ufffddesigned and as\ufffdbuilt data list 4.3.5 Configuration verification 4.3.6 Configuration management process audit 4.3.7 Configuration management approach for operational phase <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.3.8 Implementation of information\/documentation management 4.3.8.1 Overview 4.3.8.2 Creation and revision <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.3.8.3 Review 4.3.8.4 Delivery <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4.3.8.5 Storage and retrieval 4.3.8.6 Archiving and retrieval <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5 Configuration management requirements 5.1 General 5.2 Management and planning 5.2.1 Configuration management plan 5.2.1.1 General 5.2.1.2 Information security 5.2.1.3 Classification <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.2.2 Configuration management interfaces 5.3 Implementation of configuration management 5.3.1 Configuration identification 5.3.1.1 Configuration item <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.3.1.2 Configuration item selection 5.3.1.3 Configuration baseline <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.3.1.4 Baseline establishment <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.3.1.5 Identification marking <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.3.1.6 Digital file and media identification <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.3.2 Configuration control 5.3.2.1 Change procedure <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.3.2.2 Classification of changes and departures 5.3.2.3 Initiation of change 5.3.2.4 Change assessment 5.3.2.5 Change disposition <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.3.2.6 Departures from configuration baseline 5.3.2.7 Baseline and documentation update 5.3.2.8 Interface control 5.3.3 Configuration status accounting 5.3.3.1 General <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 5.3.3.2 As\ufffddesigned data list 5.3.3.3 As\ufffdbuilt data list 5.3.4 Configuration verification 5.3.4.1 Verification of the product configuration definition <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 5.3.4.2 Verification of the product configuration 5.3.5 Audit of the configuration management system 5.3.6 Configuration management approach for operational phase <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 5.3.7 Implementation of information\/documentation management 5.3.7.1 General 5.3.7.2 Creation and revision <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 5.3.7.3 Review <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5.3.7.4 Delivery <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 5.3.7.5 Storage and retrieval 5.3.7.6 Archiving and Retrieval <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Space project management – Configuration and information management<\/b><\/p>\n |