{"id":454776,"date":"2024-10-20T09:37:19","date_gmt":"2024-10-20T09:37:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/icc-specialinspectionmanual-2021-1stptg\/"},"modified":"2024-10-26T17:51:47","modified_gmt":"2024-10-26T17:51:47","slug":"icc-specialinspectionmanual-2021-1stptg","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/icc\/icc-specialinspectionmanual-2021-1stptg\/","title":{"rendered":"ICC SpecialInspectionManual 2021 1stptg"},"content":{"rendered":"

In extreme natural events such as earthquakes and hurricanes, the most common contributing factor to significant structural damage and building failure is construction that fails to comply with current codes, standards and design documents. Having specialized oversight and increased inspection frequency and duration during construction helps mitigate construction issues. The Special Inspection Manual gives details for required special inspections and structural observation. The manual contains the requirements for special inspections required by the International Building Code and its referenced material standards with descriptions of the required inspections. The book also contains information on creating a special inspection overview program within a building department, including procedures and forms useful in running the program. Additionally, the Manual supports preparation for special inspection certification exams and assists in writing statements of special inspection. The guidance in the manual is based on recommended practices and the consensus of building officials, design professionals and inspection and testing agencies. Duties and responsibilities of the special inspector, building official, project owner, engineer and architect of record, and general contractor are defined.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nSPECIAL INSPECTION MANUAL 2021 EDITION <\/td>\n<\/tr>\n
2<\/td>\nSPECIAL INSPECTION MANUAL 2021 EDITION TITLE PAGE <\/td>\n<\/tr>\n
3<\/td>\nCOPYRIGHT <\/td>\n<\/tr>\n
4<\/td>\nTABLE OF CONTENTS <\/td>\n<\/tr>\n
10<\/td>\nFOREWORD <\/td>\n<\/tr>\n
12<\/td>\nPREFACE <\/td>\n<\/tr>\n
13<\/td>\nACKNOWLEDGEMENTS
ABOUT THE AUTHOR
ABOUT THE INTERNATIONAL CODE COUNCIL\u00ae <\/td>\n<\/tr>\n
16<\/td>\nCHAPTER 1\u2014SPECIAL INSPECTION
INTRODUCTION <\/td>\n<\/tr>\n
17<\/td>\nHISTORY <\/td>\n<\/tr>\n
18<\/td>\nSPECIAL INSPECTION <\/td>\n<\/tr>\n
19<\/td>\nKEY ASPECTS OF SPECIAL INSPECTIONS <\/td>\n<\/tr>\n
20<\/td>\nTHE INTEGRAL PARTICIPANTS OF SPECIAL INSPECTION <\/td>\n<\/tr>\n
21<\/td>\nSPECIAL INSPECTOR
ORGANIZATION OF THE SPECIAL INSPECTION MANUAL
CHAPTERS <\/td>\n<\/tr>\n
22<\/td>\nAPPENDICES <\/td>\n<\/tr>\n
24<\/td>\nCHAPTER 2\u2014SPECIAL INSPECTOR’S DUTIES <\/td>\n<\/tr>\n
25<\/td>\nWHO BECOMES A SPECIAL INSPECTOR? <\/td>\n<\/tr>\n
26<\/td>\nCERTIFICATION
APPROVAL
DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR <\/td>\n<\/tr>\n
27<\/td>\nPRIOR TO THE JOB SITE <\/td>\n<\/tr>\n
31<\/td>\nIMAGE: FIGURE 2.1: CONSTRUCTION DOCUMENTS <\/td>\n<\/tr>\n
32<\/td>\nAT THE JOB SITE <\/td>\n<\/tr>\n
33<\/td>\nFIGURE 2.2: PREPARATION OF CONCRETE CYLINDERS <\/td>\n<\/tr>\n
34<\/td>\nAT THE END OF THE PROJECT <\/td>\n<\/tr>\n
35<\/td>\nWORKING WITH THE BUILDING DEPARTMENT
WHO HIRES THE SPECIAL INSPECTOR? <\/td>\n<\/tr>\n
36<\/td>\nINSPECTION OF FABRICATORS <\/td>\n<\/tr>\n
38<\/td>\nCHAPTER 3\u2014OTHER INTEGRAL PARTICIPANTS DUTIES
DUTIES AND RESPONSIBILITIES OF THE PROJECT OWNER <\/td>\n<\/tr>\n
39<\/td>\nDUTIES AND RESPONSIBILITIES OF THE REGISTERED DESIGN PROFESSSIONAL IN RESPONSIBLE CHARGE <\/td>\n<\/tr>\n
41<\/td>\nDUTIES AND RESPONSIBILITIES OF THE CONTRACTOR <\/td>\n<\/tr>\n
42<\/td>\nFIGURE 3.1: CONTRACTOR STATEMENT OF RESPONSIBILITY FORM <\/td>\n<\/tr>\n
43<\/td>\nDUTIES AND RESPONSIBILITIES OF THE BUILDING OFFICIAL <\/td>\n<\/tr>\n
46<\/td>\nPRECONSTRUCTION MEETING <\/td>\n<\/tr>\n
48<\/td>\nCHAPTER 4\u2014JURISDICTIONAL INSPECTION VS. SPECIAL INSPECTION
WHY IS JURISDICTIONAL INSPECTION INSUFFICIENT IN SOME CASES? <\/td>\n<\/tr>\n
49<\/td>\nCOMPLEX, UNCOMMON OR UNIQUE CONSTRUCTION <\/td>\n<\/tr>\n
50<\/td>\nJURISDICTIONAL INSPECTIONS
COMPARISON OF TIMING OF JURISDICTIONAL AND SPECIAL INSPECTIONS <\/td>\n<\/tr>\n
51<\/td>\nFIGURE 4.1: URBAN CONSTRUCTION <\/td>\n<\/tr>\n
52<\/td>\nFIGURE 4.2: REINFORCED FOOTING
TABLE 4.1A: COMPARISON OF JURISDICTIONAL INSPECTIONS AND SPECIAL INSPECTIONS\u2014FOUNDATION <\/td>\n<\/tr>\n
53<\/td>\nTABLE 4.1B: COMPARISON OF JURISDICTIONAL INSPECTIONS AND SPECIAL INSPECTIONS\u2014FOUNDATION <\/td>\n<\/tr>\n
54<\/td>\nFIGURE 4.3: CONCRETE SLAB AND UNDER-FLOOR INSPECTION
TABLE 4.1C: COMPARISON OF JURISDICTIONAL INSPECTIONS AND SPECIAL INSPECTIONS\u2014FOUNDATION <\/td>\n<\/tr>\n
55<\/td>\nFIGURE 4.4: FRAMED WALLS AND ROOF TRUSSES <\/td>\n<\/tr>\n
56<\/td>\nTABLE 4.2A: COMPARISON OF JURISDICTIONAL INSPECTION VS. SPECIAL INSPECTION\u2014FRAME INSPECTIONS\u2014STEEL AND CONCRETE <\/td>\n<\/tr>\n
57<\/td>\nTABLE 4.2B: COMPARISON OF JURISDICTIONAL INSPECTION VS. SPECIAL INSPECTION\u2014FRAME INSPECTIONS\u2014MASONRY AND WOOD <\/td>\n<\/tr>\n
59<\/td>\nFIGURE 4.5: FIRE- AND SMOKE-RESISTANT PENETRATIONS
TABLE 4.3: COMPARISON OF JURISDICTIONAL INSPECTION VS SPECIAL INSPECTION\u2014FIRE RESISTANCE <\/td>\n<\/tr>\n
60<\/td>\nINSPECTIONS IN THE INTERNATIONAL RESIDENTIAL CODE <\/td>\n<\/tr>\n
61<\/td>\nFIGURE 4.6: RESIDENTIAL CONSTRUCTION
TABLE 4.4: RESIDENTIAL INSPECTION REQUIREMENTS <\/td>\n<\/tr>\n
62<\/td>\nMATERIALS REQUIRING SPECIAL INSPECTION
STEEL CONSTRUCTION
FIGURE 4.7: AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND AISC 341 SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS <\/td>\n<\/tr>\n
63<\/td>\nFIGURE 4.8: STRUCTURAL STEEL CONSTRUCTION
FIGURE 4.9: SDI QAQC COVER
FIGURE 4.10A: SJI 100-20 <\/td>\n<\/tr>\n
64<\/td>\nFIGURE 4.11: COLD-FORMED STEEL JOISTS
CONCRETE CONSTRUCTION
FIGURE 4.12: ACI 318-19 BUIDLING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY <\/td>\n<\/tr>\n
65<\/td>\nFIGURE 4.13: CONCRETE CONSTRUCTION
FIGURE 4.14: CONCRETE CYLINDERS FOR STRENGTH TEST SPECIMENS <\/td>\n<\/tr>\n
66<\/td>\nMASONRY CONSTRUCTION
FIGURE 4.15: TMS 402\/602 <\/td>\n<\/tr>\n
67<\/td>\nFIGURE 4.16: MASONRY CONSTRUCTION
WOOD CONSTRUCTION
FIGURE 4.17: WOOD CONSTRUCTION <\/td>\n<\/tr>\n
68<\/td>\nFIGURE 4.18: SIP ASSEMBLY <\/td>\n<\/tr>\n
69<\/td>\nFIGURE 4.19: WOOD CONSTRUCTION TESTING OF HIGH-LOAD DIAPHRAGM
FIGURE 4.20: WOOD CONSTRUCTION\u2014LONG TRUSS SPANS <\/td>\n<\/tr>\n
70<\/td>\nSOILS
FIGURE 4.21: SOILS\u2014EXCAVATION
DEEP FOUNDATIONS
FIGURE 4.22: DRIVEN H-PILE <\/td>\n<\/tr>\n
71<\/td>\nWIND RESISTANCE
FIGURE 4.23: HIGH WIND\u2014ROOF CONNECTIONS
SEISMIC RESISTANCE <\/td>\n<\/tr>\n
72<\/td>\nFIGURE 4.24: STORAGE RACKS <\/td>\n<\/tr>\n
73<\/td>\nFIGURE 4.25: EMERGENCY ELECTRICAL SYSTEM
TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE
FIGURE 4.26: COMPONENT TESTING <\/td>\n<\/tr>\n
74<\/td>\nSPRAYED FIRE-RESISTANT MATERIALS
FIGURE 4.27: SPRAYED FIRE-RESISTANT MATERIALS
MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS <\/td>\n<\/tr>\n
75<\/td>\nFIGURE 4.28: INTUMESCENT COATING ON STEEL COLUMNS
EXTERIOR INSULATION AND FINISH SYSTEMS
FIGURE 4.29: EIFS INSTALLATION <\/td>\n<\/tr>\n
76<\/td>\nFIRE-RESISTANT PENETRATIONS AND JOINTS
FIGURE 4.30: FIRE-RESISTANT JOINT <\/td>\n<\/tr>\n
77<\/td>\nFIGURE 4.31: FIRESTOP
SMOKE CONTROL TESTING <\/td>\n<\/tr>\n
78<\/td>\nFIGURE 4.32: SMOKE CONTROL TEST <\/td>\n<\/tr>\n
80<\/td>\nCHAPTER 5\u2014STRUCTURAL SPECIAL INSPECTIONS
REQUIRED VERIFICATION AND INSPECTION-STRUCTURAL MATERIALS
PERIODIC AND CONINUOUS SPECIAL INSPECTION <\/td>\n<\/tr>\n
81<\/td>\nSTEEL CONSTRUCTION <\/td>\n<\/tr>\n
82<\/td>\nFIGURE 5.1: AISC 360 AND AISC 341
FIGURE 5.2: AWS D1.1 <\/td>\n<\/tr>\n
83<\/td>\nTABLE 5.1: PROVISIONS FOR STEEL CONSTRUCTION <\/td>\n<\/tr>\n
85<\/td>\nTABLE 5.2: MODIFIED FROM AISC 360 TABLE N5.4-1: INSPECTION TASKS PRIOR TO WELDING <\/td>\n<\/tr>\n
86<\/td>\nTABLE 5.3: MODIFIED FROM AISC 360 TABLE N5.4-2: INSPECTION TASKS DURING WELDING <\/td>\n<\/tr>\n
87<\/td>\nTABLE 5.4: MODIFIED FROM AISC 360 TABLE N5.4-3: INSPECTION TASKS AFTER WELDING <\/td>\n<\/tr>\n
88<\/td>\nTABLE 5.5: TYPES OF NONDESTRUCTIVE TESTING <\/td>\n<\/tr>\n
89<\/td>\nFIGURE 5.3: WELDED STRUCTURAL STEEL
FIGURE 5.4: SPECIFICATION FOR STRUCTURAL JOISTS USING HIGH STRENGTH BOLTS <\/td>\n<\/tr>\n
90<\/td>\nTABLE 5.6: MODIFIED FROM AISC 360 TABLES N5.6-1, N5.6-2 AND N5.6-3: INSPECTION TASKS FOR BOLTING <\/td>\n<\/tr>\n
92<\/td>\nFIGURE 5.5: BOLTED STEEL CONNECTIONS <\/td>\n<\/tr>\n
94<\/td>\nTABLE 5.7: MODIFIED FROM AISC 341 TABLE J6.1: VISUAL INSPECTION TASKS PRIOR TO WELDING <\/td>\n<\/tr>\n
95<\/td>\nTABLE 5.8: MODIFIED FROM AISC 341 TABLE J6.2: VISUAL INSPECTION TASKS DURING WELDING <\/td>\n<\/tr>\n
96<\/td>\nTABLE 5.9: MODIFIED FROM AISC 341 TABLE J6.3: VISUAL INSPECTION TASKS AFTER WELDING <\/td>\n<\/tr>\n
97<\/td>\nTABLE 5.10: ADDITIONAL TESTING WHEN WELDING SEISMIC FORCE-RESISTING SYSTEMS <\/td>\n<\/tr>\n
99<\/td>\nTABLE 5.11: AISC 341 TABLES J7.1, J7.2 AND J7.3: INSPECTION TASKS FOR BOLTING
TABLE 5.12: SPECIAL INSPECTION TASKS FOR REDUCED BEAM SECTIONS AND H-PILES <\/td>\n<\/tr>\n
100<\/td>\nTABLE 5.13: MODIFIED FROM AISC 341 TABLES J9.1, J9.2 AND J9.3, SPECIAL INSPECTION TASKS FOR COMPOSITE STRUCTURES <\/td>\n<\/tr>\n
101<\/td>\nFIGURE 5.6: A) ADEQUATE BOLTING B) INADEQUATE BEARING C) BOLTING REPAIR <\/td>\n<\/tr>\n
102<\/td>\nCOLD-FORMED STEEL CONSTRUCTION
TABLE 5.14: MODIFIED FROM SDI QA\/QC TABLES 1.1 AND 1.2 <\/td>\n<\/tr>\n
103<\/td>\nTABLE 5.15: MODIFIED FROM SDI QA\/QC TABLES 1.3, 1.4 AND 1.5 <\/td>\n<\/tr>\n
104<\/td>\nTABLE 5.16: MODIFIED FROM SDI QA\/QC TABLES 1.6, 1.7 AND 1.8
FIGURE 5.7: COLD-FORMED STEEL CONSTRUCTION <\/td>\n<\/tr>\n
105<\/td>\nTABLE 5.17: REQUIRED SPECIAL INSPECTIONS FOR OPEN-WEB STEEL JOISTS AND JOIST GIRDERS
CONCRETE CONSTRUCTION <\/td>\n<\/tr>\n
106<\/td>\nFIGURE 5.8: ACI 318
FIGURE 5.9: CONCRETE FOUNDATION WALLS <\/td>\n<\/tr>\n
107<\/td>\nTABLE 5.18: MODIFIED IBC TABLE 1705.3, REQUIRED SPECIAL INSPECTION AND TESTS OF CONCRETE CONSTRUCTION <\/td>\n<\/tr>\n
108<\/td>\nTABLE 5.18: MODIFIED IBC TABLE 1705.3, REQUIRED SPECIAL INSPECTION AND TESTS OF CONCRETE CONSTRUCTION (continued)
FIGURE 5.10: CONCRETE CONSTRUCTION\u2014LAYOUT OF REBAR AND PRESTRESSING TENDONS <\/td>\n<\/tr>\n
109<\/td>\nFIGURE 5.11: CONCRETE CONSTRUCTION\u2014CONCRETE PLACEMENT
FIGURE 5.12: CONCRETE CONSTRUCTION\u2014TILT-UP WALLS <\/td>\n<\/tr>\n
110<\/td>\nFIGURE 5.13: CONCRETE SPECIAL INSPECTION\u2014SLUMP TEST <\/td>\n<\/tr>\n
111<\/td>\nFIGURE 5.14: CONCRETE CONSTRUCTION\u2014WELDED REBAR <\/td>\n<\/tr>\n
112<\/td>\nMASONRY CONSTRUCTION
FIGURE 5.15: TMS 402\/602-16 <\/td>\n<\/tr>\n
114<\/td>\nTABLE 5.19 MODIFIED TMS 602 TABLES 3 AND 4, LEVEL 2 QUALITY ASSURANCE <\/td>\n<\/tr>\n
115<\/td>\nTABLE 5.19 MODIFIED TMS 602 TABLES 3 AND 4, LEVEL 2 QUALITY ASSURANCE (continued) <\/td>\n<\/tr>\n
116<\/td>\nFIGURE 5.16: MASONRY CONSTRUCTION
WOOD CONSTRUCTION <\/td>\n<\/tr>\n
117<\/td>\nFIGURE 5.17: WOOD CONSTRUCTION\u2014HIGH-LOAD DIAPHRAGM <\/td>\n<\/tr>\n
118<\/td>\nFIGURE 5.18: LONG SPAN WOOD TRUSSES
FIGURE 5.19: MASS TIMBER CONSTRUCTION <\/td>\n<\/tr>\n
120<\/td>\nTABLE 5.20: MODIFIED IBC TABLE 1705.5.3 REQUIRED SPECIAL INSPECTIONS OF MASS TIMBER CONSTRUCTION
FIGURE 5.20: STRUCTURAL INSULATED PANELS <\/td>\n<\/tr>\n
121<\/td>\nSOILS
TABLE 5.21: MODIFIED IBC TABLE 1705.6\u2014REQUIRED VERIFICATION AND INSPECTION OF SOILS <\/td>\n<\/tr>\n
122<\/td>\nFIGURE 5.21: SOILS\u2014EXCAVATION
DEEP FOUNDATION CONSTRUCTION <\/td>\n<\/tr>\n
123<\/td>\nFIGURE 5.22: HELICAL PILE LOAD TEST
TABLE 5.22: SUMMARY OF DEEP FOUNDATION PROVISIONS <\/td>\n<\/tr>\n
124<\/td>\nFIGURE 5.23: DRIVEN DEEP FOUNDATION ELEMENTS
FIGURE 5.24: FOUNDATION BRACING <\/td>\n<\/tr>\n
125<\/td>\nTABLE 5.23: MODIFIED IBC TABLE 1705.7, REQUIRED VERIFICATION AND INSPECTION OF DRIVEN DEEP FOUNDATION ELEMENTS
FIGURE 5.25: CAST-IN-PLACE PIERS <\/td>\n<\/tr>\n
126<\/td>\nTABLE 5.24: MODIFIED IBC TABLE 1705.8, REQUIRED VERIFICATION AND INSPECTION OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS
TABLE 5.25: REQUIRED VERIFICATION AND INSPECTION OF HELICAL PILES
STRUCTURAL INTEGRITY OF DEEP FOUNDATION ELEMENTS <\/td>\n<\/tr>\n
127<\/td>\nFABRICATED ITEMS
SPECIAL INSPECTIONS FOR WIND RESISTANCE <\/td>\n<\/tr>\n
128<\/td>\nTABLE 5.26 SUMMARY OF SPECIAL INSPECTION REQUIREMENTS FOR WIND RESISTANCE <\/td>\n<\/tr>\n
129<\/td>\nFIGURE 5.26: COLD-FORMED STEEL ANCHORAGE
SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE <\/td>\n<\/tr>\n
131<\/td>\nTABLE 5.27 SUMMARY OF STRUCTURAL SPECIAL INSPECTIONS OF SEISMIC RESISTANCE <\/td>\n<\/tr>\n
132<\/td>\nTABLE 5.28: SUMMARY OF NONSTRUCTURAL SYSTEMS SPECIAL INSPECTION FOR SEISMIC RESISTANCE <\/td>\n<\/tr>\n
133<\/td>\nTABLE 5.28: SUMMARY OF NONSTRUCTURAL SYSTEMS SPECIAL INSPECTION FOR SEISMIC RESISTANCE (continued) <\/td>\n<\/tr>\n
134<\/td>\nTABLE 5.29: MODIFIED TABLE 1705.13.7, REQUIRED INSPECTIONS OF STORAGE RACK SYSTEMS
FIGURE 5.27: ARCHITECTURAL ELEMENT <\/td>\n<\/tr>\n
135<\/td>\nFIGURE 5.28: STORAGE RACKS
FIGURE 5.29: ELECTRICAL SYSTEMS <\/td>\n<\/tr>\n
136<\/td>\nFIGURE 5.30: SEISMIC DAMPER
TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE <\/td>\n<\/tr>\n
137<\/td>\nTABLE 5.30: SUMMARY OF TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE
SPECIAL CASES <\/td>\n<\/tr>\n
140<\/td>\nCHAPTER 6\u2014NONSTRUCTURAL SPECIAL INSPECTIONS
PERIODIC AND CONTINUOUS SPECIAL INSPECTION <\/td>\n<\/tr>\n
141<\/td>\nREQUIRED VERIFICATION AND INSPECTION-LIFE SAFETY AND NONSTRUCTURAL MATERIALS
SPRAYED FIRE-RESISTANT MATERIALS
FIGURE 6.1: SPRAYED FIRE-RESISTANT MATERIALS <\/td>\n<\/tr>\n
142<\/td>\nTABLE 6.1: SUMMARY OF SPECIAL INSPECTIONS FOR SPRAYED FIRE-RESISTANT MATERIALS <\/td>\n<\/tr>\n
143<\/td>\nTABLE 6.2: SUMMARY OF SPECIAL INSPECTIONS FOR SPRAYED FIRE-RESISTANT MATERIAL THICKNESS <\/td>\n<\/tr>\n
144<\/td>\nTABLE 6.3: SUMMARY OF SPECIAL INSPECTIONS FOR SPRAYED FIRE-RESISTANT MATERIAL DENSITY AND BOND STRENGTH
MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS <\/td>\n<\/tr>\n
145<\/td>\nFIGURE 6.2: INTUMESCENT COATED COLUMNS
TABLE 6.4: SUMMARY OF SPECIAL INSPECTIONS FOR MASTIC AND INTUMESCENT COATINGS
EXTERIOR INSULATION AND FINISH SYSTEMS <\/td>\n<\/tr>\n
146<\/td>\nFIGURE 6.3: EIFS <\/td>\n<\/tr>\n
147<\/td>\nTABLE 6.5: SUMMARY OF SPECIAL INSPECTIONS FOR CLASSIC EIFS <\/td>\n<\/tr>\n
148<\/td>\nTABLE 6.6: SUMMARY OF SPECIAL INSPECTIONS FOR EIFS WATER-RESISTIVE BARRIER COATING
FIRE-RESISTANT PENETRATIONS AND JOINTS <\/td>\n<\/tr>\n
149<\/td>\nFIGURE 6.4: FIRESTOP
TABLE 6.7: SUMMARY OF SPECIAL INSPECTION OF FIRESTOPS <\/td>\n<\/tr>\n
150<\/td>\nFIGURE 6.5: FIRE-RESISTANT JOINTS <\/td>\n<\/tr>\n
151<\/td>\nTABLE 6.8: SUMMARY OF SPECIAL INSPECTION OF FIRE-RESISTANT JOINT SYSTEMS
SMOKE CONTROL SYSTEMS <\/td>\n<\/tr>\n
152<\/td>\nFIGURE 6.6: SMOKE CONTROL TESTING <\/td>\n<\/tr>\n
153<\/td>\nSEALING OF MASS TIMBER
FIGURE 6.7: SEALANTS <\/td>\n<\/tr>\n
154<\/td>\nCHAPTER 7\u2014STRUCTURAL OBSERVATION <\/td>\n<\/tr>\n
155<\/td>\nFIGURE 7.1: STRUCTURAL OBSERVATION OF CONCRETE SAMPLING
PROCESS OF STRUCTURAL OBSERVATION <\/td>\n<\/tr>\n
156<\/td>\nWHEN STRUCTURAL OBSERVATIONS ARE REQUIRED
FIGURE 7.2: BRACED FRAMES FORM THE MAIN WINDFORCE-RESISTING SYSTEM IN THE OBSERVATION TOWER <\/td>\n<\/tr>\n
157<\/td>\nDETERMINING COMPONENTS REQUIRING STRUCTURAL OBSERVATION
FIGURE 7.3: STEEL MOMENT FRAME
FIGURE 7.4: CONCRETE BEAM-COLUMN CONNECTIONS <\/td>\n<\/tr>\n
158<\/td>\nFIGURE 7.5: LIGHT-FRAME DRAG STRUT
FIGURE 7.6: ROOF TRUSS CONNECTION IN MASONRY WALLS <\/td>\n<\/tr>\n
159<\/td>\nFIGURE 7.7: NOTIFICATION OF DEFICIENCY REPORT <\/td>\n<\/tr>\n
160<\/td>\nCHAPTER 8\u2014ALTERNATIVE PRODUCTS AND METHODS OF CONSTRUCTION
ALTERNATIVE MATERIALS AND METHODS OF CONSTRUCTION <\/td>\n<\/tr>\n
161<\/td>\nFIGURE 8.1: ALTERNATIVE MATERIAL <\/td>\n<\/tr>\n
162<\/td>\nAPPROVALS <\/td>\n<\/tr>\n
163<\/td>\nFIGURE 8.2: TESTING OF MASONRY PRISM <\/td>\n<\/tr>\n
164<\/td>\nLABELING <\/td>\n<\/tr>\n
165<\/td>\nFIGURE 8.3: ENGINEERED WOOD PRODUCT IDENTIFICATION <\/td>\n<\/tr>\n
166<\/td>\nPREFABRICATED ASSEMBLIES
FABRICATORS <\/td>\n<\/tr>\n
167<\/td>\nFIGURE 8.4: FABRICATOR’S CERTIFICATE <\/td>\n<\/tr>\n
168<\/td>\nFIGURE 8.5: REINFORCING STEEL FABRICATOR
DESIGN STRENGTH OF MATERIALS <\/td>\n<\/tr>\n
169<\/td>\nALTERNATIVE TEST PROCEDURE <\/td>\n<\/tr>\n
170<\/td>\nIN-SITU LOAD TESTS <\/td>\n<\/tr>\n
171<\/td>\nPRECONSTRUCTION LOAD TESTS <\/td>\n<\/tr>\n
174<\/td>\nFIGURE 8.6: PRECONSTRUCTION LOAD TEST ON A DOOR HINGE
WINDBORNE DEBRIS PROTECTION <\/td>\n<\/tr>\n
176<\/td>\nFIGURE 8.7: TEST SPECIMEN
EVALUATION REPORTS <\/td>\n<\/tr>\n
177<\/td>\nNEW PRODUCTS <\/td>\n<\/tr>\n
178<\/td>\nCHAPTER 9\u2014APPROVED AGENCIES
TERMINOLOGY <\/td>\n<\/tr>\n
179<\/td>\nAPPROVED AGENCY CHARACTERISTICS <\/td>\n<\/tr>\n
180<\/td>\nFIGURE 9.1: SAMPLE SPECIAL INSPECTION AGENCY CERTIFICATE <\/td>\n<\/tr>\n
182<\/td>\nCHAPTER 10\u2014BUILDING DEPARTMENTS
DUTIES OF THE BUILDING DEPARTMENT <\/td>\n<\/tr>\n
183<\/td>\nRESPONSIBILITIES OF THE BUILDING DEPARTMENT
SPECIAL INSPECTION PROGRAM STAFFING <\/td>\n<\/tr>\n
184<\/td>\nRESPONSIBILITIES OUTSIDE THE BUILDING DEPARTMENT <\/td>\n<\/tr>\n
185<\/td>\nENSURING COMPETENCE
APPROVAL CRITERIA <\/td>\n<\/tr>\n
186<\/td>\nEXISTING SPECIAL INSPECTION PROGRAMS
ESTABLISHING A SPECIAL INSPECTION PROGRAM <\/td>\n<\/tr>\n
187<\/td>\nSTEP 1: ESTABLISH QUALIFICATIONS AND INTERNAL QUALITY CONTROL <\/td>\n<\/tr>\n
189<\/td>\nFIGURE 10.1: SAMPLE RESPONSIBILITIES AND CONSEQUENCES STATEMENT\u2014SPECIAL INSTRUCTOR
FIGURE 10.2: SAMPLE RESPONSIBILITIES AND CONSEQUENCES STATEMENT\u2014SPECIAL INSPECTION AGENCY <\/td>\n<\/tr>\n
190<\/td>\nSTEP 2: SPECIAL INSPECTION AGENCY APPLICATION AND EVALUATION <\/td>\n<\/tr>\n
191<\/td>\nSTEP 3: SPECIAL INSPECTOR APPLICATION AND EVALUATION <\/td>\n<\/tr>\n
192<\/td>\nFIGURE 10.3: SAMPLE TEST FROM SPECIAL INSPECTION WORK VERIFICATION CRITERIA FOR MASONRY <\/td>\n<\/tr>\n
193<\/td>\nSTEP 4: PRESCRIBE ON-SITE AND FINAL REPORT REQUIREMENTS
FIGURE 10.4: SAMPLE TEXT OF RESPONSIBILITY STATEMENT <\/td>\n<\/tr>\n
195<\/td>\nFIGURE 10.5: SAMPLE TEXT FROM A FINAL SPECIAL INSPECTION REPORT <\/td>\n<\/tr>\n
196<\/td>\nFIGURE 10.6: SAMPLE TEXT OF SPECIAL INSPECTOR STATEMENT
STEP 5: ISSUING SPECIAL INSPECTION AGENCY AGREEMENTS <\/td>\n<\/tr>\n
197<\/td>\nFIGURE 10.7: SAMPLE TEXT FROM SPECIAL INSPECTION AGREEMENT
FIGURE 10.8: SAMPLE TEXT FROM THE STATEMENT OF SPECIAL INSPECTION AGREEMENT <\/td>\n<\/tr>\n
198<\/td>\nSTEP 6: DEVELOPING A REPORT REVIEW PROCEDURE
FIGURE 10.9: SAMPLE TEXT FOR STATEMENT OF AUDIT <\/td>\n<\/tr>\n
199<\/td>\nFIGURE 10.10: SAMPLE TEXT FROM INSPECTION\/TESTING AGENCY PROJECT AUDIT <\/td>\n<\/tr>\n
200<\/td>\nFIGURE 10.11: SAMPLE TEXT FROM FIELD OPERATION AUDIT REPORT
FIGURE 10.12: SAMPLE TEXT FROM FIELD TESTING AUDIT REPORT
STEP 7: IMPLEMENT THE PROGRAM <\/td>\n<\/tr>\n
201<\/td>\nSTEP 8: REVALUATE THE PROGRAM PERIODICALLY <\/td>\n<\/tr>\n
202<\/td>\nAPPENDIX A\u2014DEFINITIONS <\/td>\n<\/tr>\n
212<\/td>\nAPPENDIX B\u2014FORMS <\/td>\n<\/tr>\n
213<\/td>\nB.1 TECHNICAL GUIDELINES
B.1.1 QUALITY MANUAL GUIDELINE <\/td>\n<\/tr>\n
223<\/td>\nB.2 APPROVAL LISTING FORMS
B.2.1 APPROVAL REQUIREMENTS CHECK SHEET <\/td>\n<\/tr>\n
224<\/td>\nB.2.2 SPECIAL INSPECTION AND TESTING AGENCY APPROVAL LISTING FORM <\/td>\n<\/tr>\n
225<\/td>\nB.2.3 FABRICATION\/MANUFACTURER APPROVAL LISTING FORM <\/td>\n<\/tr>\n
226<\/td>\nB.3 INSPECTION RECORDS-REPORT REQUIREMENTS <\/td>\n<\/tr>\n
227<\/td>\nB.3.1 DAILY REPORT FORM <\/td>\n<\/tr>\n
229<\/td>\nB.3.2 WEEKLY REPORT FORM <\/td>\n<\/tr>\n
231<\/td>\nB.3.3 DISCREPANCY NOTICE FORM <\/td>\n<\/tr>\n
232<\/td>\nB.3.4 FINAL REPORT FORM <\/td>\n<\/tr>\n
233<\/td>\nB.4 INSPECTION AGREEMENT FORMS
B.4.1 SPECIAL INSPECTION AGREEMENT <\/td>\n<\/tr>\n
238<\/td>\nB.4.2 ADDENDUM TO THE SPECIAL INSPECTION AGREEMENT <\/td>\n<\/tr>\n
240<\/td>\nB.4.3 STATEMENT OF SPECIAL INSPECTIONS SCHEDULE <\/td>\n<\/tr>\n
243<\/td>\nB.4.4 SPECIAL INSPECTION RECORD <\/td>\n<\/tr>\n
244<\/td>\nB.5 AUDITS
B.5.1 TECHNICAL GUIDELINES FOR SPECIAL INSPECTION\/TESTING AGENCY PROJECT AUDITS <\/td>\n<\/tr>\n
253<\/td>\nB.5.2 FIELD OPERATIONS AUDIT <\/td>\n<\/tr>\n
255<\/td>\nB.5.3 FIELD TESTING AUDIT <\/td>\n<\/tr>\n
257<\/td>\nB.6 STRUCTURAL OBSERVER
B.6.1 STRUCTURAL OBSERVER DISCREPANCY NOTICE <\/td>\n<\/tr>\n
258<\/td>\nB.7 PRECONSTRUCTION MEETINGS
B.7.1 PRECONSTRUCTION MEETING FORM\u2014SAMPLES <\/td>\n<\/tr>\n
262<\/td>\nB.8 CONTRACTOR STATEMENT OF RESPONSIBILITY
B.8.1 CONTRACTOR STATEMENT OF RESPONSIBILITY <\/td>\n<\/tr>\n
263<\/td>\nB.9 APPROVED FABRICATORS
B.9.1 FABRICATOR CERTIFICATE OF COMPLIANCE FORM\u2014SAMPLE <\/td>\n<\/tr>\n
264<\/td>\nAPPENDIX C\u2014INSPECTOR CERTIFICATION
MODEL PROGRAM FOR SPECIAL INSPECTION <\/td>\n<\/tr>\n
265<\/td>\nAREAS OF CERTIFICATION <\/td>\n<\/tr>\n
266<\/td>\nRECOMMENDED SPECIAL INSPECTOR QUALIFICATIONS
CODE KNOWLEDGE AND PLAN-READING COMPETENCY STANDARDS <\/td>\n<\/tr>\n
267<\/td>\nTABLE C.1: SPECIAL INSPECTOR CERTIFICATION EXAMS <\/td>\n<\/tr>\n
268<\/td>\nFIGURE C.1: ICC SPECIAL INSPECTOR CERTIFICATE
EXPERIENCE STANDARDS <\/td>\n<\/tr>\n
269<\/td>\nTABLE C.2: MINIMUM QUALIFICATIONS FOR SPECIAL INSPECTORS <\/td>\n<\/tr>\n
271<\/td>\nPERFORMANCE STANDARDS
PERFORMANCE STANDARDS: JOB TASK LISTS FOR SPECIAL INSPECTORS
SPECIAL INSPECTORS\u2014GENERAL DUTIES <\/td>\n<\/tr>\n
272<\/td>\nSTEEL: STRUCTURAL, COLD-FORMED AND REINFORCING <\/td>\n<\/tr>\n
273<\/td>\nFIGURE C.2: BOLTED STEEL MEMBERS <\/td>\n<\/tr>\n
274<\/td>\nFIGURE C.3: WELDING OF STRUCTURAL STEEL MEMBERS <\/td>\n<\/tr>\n
275<\/td>\nFIGURE C.4: COLD-FORMED STEEL DECKING <\/td>\n<\/tr>\n
276<\/td>\nFIGURE C.5: WELDED REINFORCEMENT <\/td>\n<\/tr>\n
277<\/td>\nCONCRETE: REINFORCED AND PRESTRESSED <\/td>\n<\/tr>\n
279<\/td>\nFIGURE C.6: REINFORCEMENT CAGES
FIGURE C.7: CONCRETE PLACEMENT <\/td>\n<\/tr>\n
280<\/td>\nFIGURE C.8: PRESTRESSED TENDONS IN CONCRETE SLAB <\/td>\n<\/tr>\n
281<\/td>\nSTRUCTURAL MASONRY
FIGURE C.9: CONCRETE MASONRY BLOCK STORAGE
FIGURE C.10: EQUIPMENT FOR PROPER PLACEMENT AND CLEAN MATERIALS <\/td>\n<\/tr>\n
282<\/td>\nFIGUER C.11: PREFABRICATED BEAM AND REINFORCEMENT
SPRAY-APPLIED, MASTIC AND INTUMESCENT FIREPROOFING <\/td>\n<\/tr>\n
283<\/td>\nFIGURE C.12: SPRAY-APPLIED FIREPROOFING
SOILS
FIGURE C.13: EARTHWORKS EXCAVATION <\/td>\n<\/tr>\n
284<\/td>\nDEEP FOUNDATIONS
FIGURE C.14: CAST-IN-PLACE PILES <\/td>\n<\/tr>\n
285<\/td>\nFIGURE C.15: DRIVEN PILES <\/td>\n<\/tr>\n
286<\/td>\nFIGURE C.16: HELICAL PILES
BECOMING A SPECIAL INSPECTOR\u2014PATHS TO CERTIFICATION
REINFORCED CONCRETE ICC CERTIFICATION <\/td>\n<\/tr>\n
287<\/td>\nOTHER CERTIFICATIONS <\/td>\n<\/tr>\n
288<\/td>\nFIGURE C.17: FIRESTOP <\/td>\n<\/tr>\n
290<\/td>\nAPPENDIX D\u2014MANUFACTURER CERTIFICATION AND EVALUATION REPORTS
CODE PROVISIONS <\/td>\n<\/tr>\n
291<\/td>\nACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
292<\/td>\nFIGURE D.1: EXAMPLE ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
293<\/td>\nFIGURE D.1 cont.: EXAMPLE ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
294<\/td>\nFIGURE D.1 cont.: EXAMPLE ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
295<\/td>\nEVALUATION SERVICE REPORT <\/td>\n<\/tr>\n
296<\/td>\nFIGURE D.2: EVALUATION REPORT <\/td>\n<\/tr>\n
297<\/td>\nFIGURE D.2: EVALUATION REPORT\u2014continued <\/td>\n<\/tr>\n
298<\/td>\nFIGURE D.3: ICC-ES MARK OF CONFORMITY
FIGURE D.4: ICC-ES MARK OF CONFORMITY FOR LISTED PMG PRODUCTS
FIGURE D.5: ICC-ES MARK OF CONFORMITY <\/td>\n<\/tr>\n
300<\/td>\nAPPENDIX E\u2014THIRD-PARTY AGENCIES <\/td>\n<\/tr>\n
301<\/td>\nENTITIES WHICH ACCREDIT THIRD-PARTY AGENCIES <\/td>\n<\/tr>\n
302<\/td>\nACCREDITATION CRITERIA
TESTING LABORATORIES <\/td>\n<\/tr>\n
303<\/td>\nSPECIAL INSPECTION AGENCIES <\/td>\n<\/tr>\n
304<\/td>\nINSPECTION AGENCIES (FABRICATION) <\/td>\n<\/tr>\n
305<\/td>\nINSPECTION AGENCIES (THIRD-PARTY) <\/td>\n<\/tr>\n
307<\/td>\nFIGURE E.1: AC291\u2014ACCREDITATION CRITERIA FOR SPECIAL INSPECTION AGENCIES <\/td>\n<\/tr>\n
308<\/td>\nAPPENDIX F\u2014IBC SPECIAL INSPECTION PROVISIONS
2021 IBC SPECIAL INSPECTION PROVISIONS <\/td>\n<\/tr>\n
309<\/td>\n2021 IBC SPECIAL INSPECTION PROVISIONS-continued <\/td>\n<\/tr>\n
310<\/td>\n2021 IBC SPECIAL INSPECTION PROVISIONS-continued <\/td>\n<\/tr>\n
311<\/td>\n2021 IBC SPECIAL INSPECTION PROVISIONS-continued <\/td>\n<\/tr>\n
312<\/td>\n2021 IBC SPECIAL INSPECTION PROVISIONS-continued <\/td>\n<\/tr>\n
314<\/td>\nINDEX <\/td>\n<\/tr>\n
316<\/td>\nADDITIONAL CODE RESOURCES FROM ICC <\/td>\n<\/tr>\n
317<\/td>\nIAS INTERNATIONAL ACCREDITATION SERVICE\u00ae <\/td>\n<\/tr>\n
318<\/td>\nTELEWORK WITH ICC DIGITAL CODES PREMIUM <\/td>\n<\/tr>\n
319<\/td>\nPROCTORED REMOTE ONLINE TESTING OPTION (PRONTO\u2122) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Special Inspection Manual: 2021 Edition<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ICC<\/b><\/a><\/td>\n2021<\/td>\n319<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":454785,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2670],"product_tag":[],"class_list":{"0":"post-454776","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-icc","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/454776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/454785"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=454776"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=454776"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=454776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}