{"id":82723,"date":"2024-10-18T03:08:11","date_gmt":"2024-10-18T03:08:11","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-730-1-1996\/"},"modified":"2024-10-24T19:51:11","modified_gmt":"2024-10-24T19:51:11","slug":"ieee-730-1-1996","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-730-1-1996\/","title":{"rendered":"IEEE 730.1 1996"},"content":{"rendered":"
Revision Standard – Inactive – Withdrawn. This standard applies to the definition and application of function numbers for devices used in electrical substations and generating plants and in installations of power utilization and conversion apparatus.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 2. References, definitions, and acronyms 2.1 Specific references <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2.2 Definitions 2.3 Abbreviations and acronyms <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3. Contents of a Software Quality Assurance Plan <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3.1 Purpose 3.2 Reference documents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.3 Management <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.4 Documentation <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 3.5 Standards, practices, conventions and metrics <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 3.6 Reviews and audits <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 3.7 Test <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 3.8 Problem reporting and corrective action 3.9 Tools, techniques, and methodologies <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 3.10 Code control <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 3.11 Media control <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 3.12 Supplier control 3.13 Records collection, maintenance, and retention <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 3.14 Training <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 3.15 Risk management 4. Implementation of a software quality assurance plan 4.1 Acceptance by development and other personnel <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 4.2 Acceptance by management 4.3 Planning for implementation of the SQAP 4.4 Distribution of the SQAP <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 4.5 Execution of the SQAP 5. Evaluation of a software quality assurance plan 5.1 Purpose 5.2 Methodology <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 6. Modification of a software quality assurance plan 6.1 Purpose 6.2 Scope 6.3 Methodology <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7. Bibliography <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex A\u2014Summary of the SQAP and related standards <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Software Quality Assurance Planning<\/b><\/p>\n |